Vicsteel Structural | Metal & steel company
Vicsteel Structural
Phone: +61 429 520 479
Reviews
to load big map
25.01.2022 Beautiful blue skies and sunshine this morning at our Helm Apartments project for @_foursqprojects. This is the level 4 eyebrow canopy steelwork that we have installed over the last two weeks during the challenging stage 4 lockdown conditions in Melbourne. An incredible amount of work went into protection of the majestic windows above and below where this canopy was installed, with the significant site welding required. It was worth it in the end with absolutely no damaged ...windows! Normally we would have had this steel installed in a couple of days, however with the current restrictions on worker numbers, it has slowed us down a lot! Still feeling really lucky to be able to continue some sort of site works during this unprecedented time! #lockdown #structuralsteel #steelfabrication #steel #galvanised #construction #rigger #boilermaker #melbourneconstruction #welder @ Hawthorn East, Melbourne See more
24.01.2022 This is the new stair we have just installed between level 51 and level 52 of 101 Collins Street Each 2m x 1.5m section had to be fabricated and brought up in the goods lift separately, then welded back together once onsite, using a gantry, beam roller and 2t block and tackle. Handrail and balustrading still to come... #vicsteel #steelfabrication #structuralsteel #greatview #stairwaytoheaven #steelies #highrise # @ 101 Collins Street
24.01.2022 Here are some photos of our high end domestic project at 33 Fairview Road - Mount Waverley. Doesnt look much now, but will be an amazing Architecturally designed modern home early next year! There are some quite heavy steel beams in the basement to support the ground floor slab that cant be seen in these shots too... #steelies #structuralsteel #steelconstruction #vicsteel #steelfabrication #allstaraccess #anchormark @ Mount Waverley, Victoria, Australia
24.01.2022 This is a bit of a different one for us, it was a picnic shelter we fabricated and installed for Ducon Building Solutions. We fabricated the columns & oversize roof frame in the shop (3m x 5.2m), then galvanised them (double dipped) and transported to site prefabricated, ready for install! #steelerection #steelfabrication #picnic #vicsteel #picnicshelter #galvanized #boilermaker @ Possum Hollow Playground
23.01.2022 This was a small project we completed for Intrec Management at AOD Westside Lodge. The brick columns supporting one corner of the building had deteriorated, the new steelwork we installed supported the roof after they were demolished and help create a fresh open new entrance! #steelconstruction #vicsteel #intrecmanagement #structuralsteel #rigger #steeltruss @ St Albans, Victoria
22.01.2022 Another job knocked on the head This was a little plant canopy we erected this week off the side of an existing factory in Braeside. Put up in two days by two of our legendary Vicsteel Riggers... #steelfabrication #structuralsteel #rigger #dogman #steelinstallation #melbourneconstruction #steelerection #construction
22.01.2022 This was the level 1 steel at our Pacific House project for Schiavello Constructions. Weve installed over 120t of steel over 6 levels to this existing structure to date, despite the challenging access and tricky site conditions. More photos to come shortly... #steelerection #steelconstruction #welder #boilermaker #rigger #crawlercrane #steelfabrication #melbourneconstruction #crane @ Lonsdale Street, Melbourne
22.01.2022 This is the level 5 terrace steel that we installed recently at 565 Bourke Street for Plan Group. This steel was required to transfer the load of the new deck and planter boxes to the structural columns below. We had a 130t mobile crane setup in the lane way adjacent to the building to lift the steel into place. #structuralsteel #vicsteel #galvanised #steelconstruction #rigger #steelfabrication #plangroup @ Bourke Street, Melbourne
20.01.2022 Here are some photos of our Aldi Keilor project for Intrec Management. It involved a portal frame roof structure for an extension to their store, and a curved external undercover walkway around it. This is the 10th Aldi store refurb we have completed this year, with another 30 or so to do next year! #steelconstruction #steelfabrication #rigger #construction #galvanised #intrecmanagement #vicsteel #aldi #allstaraccesshire #anchormark #premiercranes @ ALDI Australia
19.01.2022 This was the level 1 steel at our Pacific House project for Schiavello Constructions. We’ve installed over 120t of steel over 6 levels to this existing structure to date, despite the challenging access and tricky site conditions. More photos to come shortly... #steelerection #steelconstruction #welder #boilermaker #rigger #crawlercrane #steelfabrication #melbourneconstruction #crane @ Lonsdale Street, Melbourne
19.01.2022 This is the steel for stage 3 of our 595 Collins Street project for GDP Construct. Very tight site in a tricky location, especially with one of the beams we erected weighing in at over 4t!?! Thanks again to Preciselift crane trucks awesome 30m reach crane, we couldnt have done it without them!!! About a week to go until its completely knocked on the head #vicsteel #steelies #structuralsteel #rigger #anchormark #gdpgroup #steelconstruction #steelerection #allstaraccess @ 595 Collins Street Melbourne CBD
19.01.2022 Trusses for days!!! These are photos of the 7 fabricated sections of trusses, during fabrication and on their way out to our Bayswater North Site. 4 of them get bolted back together to create a 38m clear span truss, with a 95mm Pre-camber, weighing in at 7 tons once bolted back together! The other 3 sections form a 32m clear span, made up of 3 sections, combining to be about 5.5t and with a 65mm pre-camber. These particular trusses took a LOT of work to: 1) plasma cut all cle...ats/connections 2) cut/prepare all sub components, 3) to mark out accurately, 4) to fabricate/put together, 5) several hundred meters of welding 6) priming for each truss. Very happy to see these go out the door, along with the balance of steel for this project (total 38t)! #engineering #trusses #steelfabrication #structuralsteel #boilermaker #welder #welding #steel #steeldetailing #semi See more
19.01.2022 So after a 12 month unintended hiatus from social media, we are back! This is our L2 pavilion project at 80 Collins street for MPA projects. Every member for this structure had to be brought up in the goods lift in under 3m lengths, and then joined/spliced/bolted back together during installation! #rigging #structuralsteel #steelfabrication #steelerection #boilermaker #welding #steelstructure #construction @mpaprojects @ 80 Collins Street Melbourne
18.01.2022 Throwback to June this year when we erected a curved roof Gymnasium structure for ADMA Group at Boronia Heights Primary School. We set up a time lapse camera to capture the steel erection process, love this one! #steelerection #steelconstruction #steelfabrication #timelapse #vicsteel #rigger #rigging #mobilecrane
17.01.2022 This is the level 1 slab steel for stage 2 of our 595 Collins Street project for GDP Construct. Very tight site in a tricky location, but this is never an issue with the correct planning and staged deliveries of steel (as well as about 200 props in the basement car park!!) more photos to come as project progresses... #vicsteel #steelies #structuralsteel #rigger #anchormark #gdpgroup #construction @ 595 Collins Street Melbourne CBD
16.01.2022 Here are some photos of our Hungry Jacks Springvale project for Hurst Concepts, which we completed late last year. It involved supplying and installing new facade and facia steel, a new drive-through canopy, and a new entrance structure. This was the first of two stores we have now helped refurbish #riggers #boilermaker #steelerection #steelfabrication #construction #dogmen #melbourneconstruction #theburgersarebetterathungryjacks @ Hungry Jacks
16.01.2022 Here’s some photos of our project at MCC Albert Reserve for @areteaustralia completed in September this year. The tricky roof structure and tying it all into the existing pavilion structure seamlessly was certainly a challenge, but with an in depth survey and site measure prior to shop detailing, this job was knocked on the head in a week without any issues! #structuralsteel #steelfabrication #boilermaker #rigger #galvanised #welding #steelerection #steeldetailing #pavilion #construction
16.01.2022 These are the Rocket Ship flue masts that we erected on top of RMIT building 5 for Intrec Management in early January. They were 12m long and had the stainless steel flues mounted to them in our yard before erection. They were erected with @premiercranes 100t mobile crane, using a man box almost 40m in the air to unhook the chains! #steelerection #boilermaker #galvanized #steelfabrication #vicsteel #rocket #rigger #mobilecrane @ RMIT University
15.01.2022 Throwback to last year when we assisted with the head office upgrade/fitout of T2 (it’s a fancy tea company) for @unispaceglobal . This was the new stair, balustrade and stainless handrail we installed as part of a larger package of works. We were really happy with the end product #stairs #structuralsteel #balustrade #handrail #boilermaker #steelfabrication #stairwaytoheaven @ Collingwood, Victoria, Australia
14.01.2022 Some of the Vicsteel team at our second Christmas function this festive season on Saturday morning just gone with ace fishing charters! Caught at least 50-60 fish, mostly whiting, with a few leatherjackets, squid, and flathead on top of that Thanks for another big year boys #legends #fishing #boilermaker #vicsteel #fish #westernport #saturdaysarefortheboys #drinks @ Westernport Marina
13.01.2022 These photos are of a project we completed last year at the Windana drug and alcohol rehab facility in Nar Nar Goon North for Arete. It involved installing steel for new decks, roofs & timber cladding support to temporary housing dongas, constructed in recycled shipping containers! This is the third project we have completed on Windana sites, which offer essential drug and alcohol rehabilitation services. #construction #crawlercrane #structuralsteel #welding #rigging #steelfabrication #building #steelerection @ Nar Nar Goon North, Victoria, Australia
13.01.2022 Here’s a few shots of our brand new Vicsteel 3t crawler crane, which we purchased late last year. Weighing in at 2t, It can lift 3t at short reach, and around 420kg’s with the boom fully extended @ 9m! It has remote operation, and can even operate on 3 phase power for internal environments. Even better, when packed away, it’ll drive through a 900mm wide doorway with room to spare Perfect for those hard to get to spots, like suburban backyards or the top level of city buildings! It’s been the perfect addition to our growing fleet of vehicles & equipment#crawlercrane #rigging #steelerection #crane #dryhire #liftandshift @ Keysborough, Victoria, Australia
12.01.2022 This is the Roof level steel for stage 2 of our 595 Collins Street project for GDP Construct. Very tight site in a tricky location, especially since the level 1 slab was poured! Thanks to Preciselift crane trucks awesome 30m reach crane, we got it up in record time!!! more photos to come as project progresses... #vicsteel #steelies #structuralsteel #rigger #anchormark #gdpgroup #steelconstruction #steelfabrication @ 595 Collins Street Melbourne CBD
12.01.2022 This is the pergola steel we recently erected at Cummins in Scoresby for Intrec Management, over the deck steel we put in last week. It was erected with an 80t crane, and was up in a day. the finished product is going to look amazing!#structuralsteel #construction #steelerection #steelies #vicsteel #premiercranes #duralift #pergola @ Cummins South Pacific
12.01.2022 Looking forward to getting this bad boy out again soon, the spring sunshine this week has been inspiring us to plan a getaway ASAP! Cant wait #vicsteel #holidays #staycation #familyholiday #sunshine #caravan #ranger
12.01.2022 This is one of the two new spine shelters we have just supplied, fabricated and erected at RMIT uni in Bundoora for Simbuilt. Once the hardwood timber slats are fitted to the back of them and the glass goes on top, they will look spectacular! #steelfabrication #steelerection #riggers #vicsteel #premiumpaint #crawlercrane #metalwork #structuralsteel #simbuilt_australia @ Rmit University, Bundoora Campus West - P3
10.01.2022 This is our Old Cheese Factory - New woodworkers workshop project for Ducon Building Solutions. It was a fairly simple build, we pretty much had it up and fully erected in 3 days. On to the next one! #structuralsteel #steelconstruction #rigger #vicsteel #steelfabrication #steelerection #allstaraccesshire #anchormark @ Old Cheese Factory
09.01.2022 This was our Aldi St Kilda project for Intrec Management, and was the 9th Aldi store refurb that we have completed since July this year. It consisted of a new plant enclosure at level 3 (above the existing store), with steel being craned up from Inkerman Street. It also had a removable section of roof for future maintenance. #steelfabrication #steelerection #mobilecrane #vicsteel #rigger #rigging #steelstructure @ ALDI Australia
09.01.2022 Here are some photos of a Gymnasium we completed recently at Boronia Heights Primary School for ADMA Group. It was a 25m clear span portal frame structure with curved roof rafters. Drone and time lapse footage to be posted shortly! #vicsteel #steelies #construction #structuralsteel #rigger #steelfabrication #allstaraccess #anchormark #lovewhatyoudo @ Boronia Heights Primary School!
08.01.2022 This is a small mezzanine extension (and stair relocation) that we supplied and installed at a clients new factory in Ravenhall. We turned this one around in record time, from being given the go ahead, to completed install was 5 days! #structuralsteel #construction #steelerection #steelies #fastturnaround #pirottaservices #fabricatedonsite @ Ravenhall
08.01.2022 This is the subfloor steel for our current Brentwood Pavilion project for @simbuilt_australia! Once the bondek goes down and slab gets poured, look out for some impressive photos of the rest of the structure! #steelfabrication #steelerection #steel #galvanised #subfloor #structuralsteel #construction #steelies @ Glen Waverley, Victoria, Australia
07.01.2022 Here are some photos of two very impressive elevated coaches boxes we supplied and erected at Caulfield Grammar, for Intrec Management. We constructed both coaches boxes on the ground using our Vicsteel 3t Crawler crane, and we then used @cranetechcranes 100t mobile crane to lift the 6.5t structures on the 2x supporting columns in each location. It was a relatively simple process, due to successful & thorough planning, and our experienced Vicsteel riggers/dogmen #structuralsteel #steelfabrication #melbourneconstruction #steelerection #steelinstallation #rigger #dogman #boilermaker #mobilecrane #crawlercrane
07.01.2022 Heres a few shots of our brand new Vicsteel 3t crawler crane, which we purchased late last year. Weighing in at 2t, It can lift 3t at short reach, and around 420kgs with the boom fully extended @ 9m! It has remote operation, and can even operate on 3 phase power for internal environments. Even better, when packed away, itll drive through a 900mm wide doorway with room to spare Perfect for those hard to get to spots, like suburban backyards or the top level of city buildings! Its been the perfect addition to our growing fleet of vehicles & equipment#crawlercrane #rigging #steelerection #crane #dryhire #liftandshift @ Keysborough, Victoria, Australia
06.01.2022 This small project was at the Corpus Christi church in Tynong, for a local domestic builder. We constructed an undercover area at the rear left of the existing church building. Easy build, up in 2 days... #steelerection #vicsteel #steelies #structuralsteel #rigger #cranetruck @ Nar Nar Goon North, Victoria, Australia
06.01.2022 Throwback to last year when we assisted with the head office upgrade/fitout of T2 (its a fancy tea company) for @unispaceglobal . This was the new stair, balustrade and stainless handrail we installed as part of a larger package of works. We were really happy with the end product #stairs #structuralsteel #balustrade #handrail #boilermaker #steelfabrication #stairwaytoheaven @ Collingwood, Victoria, Australia
06.01.2022 Here’s some photos of the completed structural steelwork at our Brentwood Pavilion project for @simbuilt_australia . It went up really well and considering it was the end of winter in Melbourne, the weather was fantastic for erecting steel On to the next one! #structuralsteel #steelerection #steelstructure #steelfabrication #construction #rigger #crane #boilermaker #sitework #melbournestructuralsteel
06.01.2022 Here are some shots from mid last week of the early stages of erecting the roof steel at our Brentwood Pavilion project, for @simbuilt_australia . Due to stage 4 covid building site staff no. restrictions, the slab has not been able to be poured as would normally be the case. Fortunately with a quick call to @allstaraccess, instead of the scissors we had booked, we had a 45’ Boomlift delivered, so we could erect the steel directly over the bondek! The team at Vicsteel are always flexible, and we work with our clients to achieve the best possible result for all involved! Keep tuned for photos of the completed structure later this week #structuralsteel #steelfabrication #steelerection #rigger #dogman #boilermaker #welder #steel #mobilecrane #construction #melbourneconstruction @ Brentwood Reserve
05.01.2022 Take a look at these massive curved 460UB75 rafters that are currently being straightened after the rolling process. There are 14 of them that bolt together to create 7 of 25m clear span rafters, for our upcoming Boronia Heights P/S gymnasium project! #steelerection #steelies #construction #vicsteel #rollingsteel #straightas
05.01.2022 Here is our first professionally edited drone footage of one of our projects, down in Red Hill, recently installed for Warwick Constructions. Credit goes to Kosta (one of our multi-talented Vicsteel riggers) for the footage! #steelies #steelerection #construction #vicsteel #warwickconstruction #drone #dronestagram
04.01.2022 Here are some photos during the construction of the absolutely amazing architectural lift shaft frame and surrounding stair that we installed late last year at our Pacific House project for @schiavelloconstruction . This masterpiece was a very challenging structure to detail, fabricate and install. Over 5 levels, we installed modular sections of this lift shaft as the slab was poured at each level, along with the steel staircase and balustrade that wraps around it! ... The curved sections shown in the photos, were fabricated from rolled 250 PFC’s, which were then fully welded back together and ground flush to create a box section, as RHS in the required size and thickness could not be successfully rolled. Despite the challenging nature of this portion of the project, the Vicsteel/Schiavello team excelled and the installation of this structure went off without a hitch. #construction #constructionmelbourne #steelfabrication #structuralsteel #rigger #dogman #crawlercrane #mobilecrane #steelstaircase #architecturaldesign #steelstructure #steel
04.01.2022 This was our 499 Ballarat Road - Sunshine project for Arete Australia. The project consisted of new structure and facade support steelwork, to an existing building. New steel to existing structures is always a challenge, but with in depth site survey and measurements taken early in the process, all the steelwork went up without any issues!#structuralsteel #steelconstruction #construction #steelerection #steelstructure #rigger #boilermaker #steelfabrication #Vicsteel @areteaustralia @ Sunshine, Victoria
03.01.2022 Here are some photos from our Aldi Colac extension project for Intrec Management, which was completed late last year. It involved extending the front of the existing store by 12m, with our large triangular trusses creating a clear span of 18m. Put up with Colac Cranes absolutely epic 35m reach crane truck, this is another one of many successful Aldi projects we have delivered with Intrec! #cranetruck #stucturalsteel #steelfabrication #steelerection #bigtruss #construction #constructionlife #riggerlife #steel #aldi #extension #boilermaker
03.01.2022 This is our Stanleys Road - Red Hill project for Warwick Constructions. It is a high end residential project, and consists of a large main dwelling structure (as shown in the attached photos), as well as a basement, wine cellar and B&B structure which is still to be constructed. #structuralsteel #construction #steelerection #steelies #rigger #welding #sunshine #penninsula #warwickconstruction @ Red Hill, Victoria
02.01.2022 This was our recent project for Ducon Building Solutions at Metro Trains disaster recovery site in Fitzroy. We erected a lift shaft frame and first floor bridge/landing, and also modified the existing stair level. This involves installing a new 6mm checker plate landing and modifying the handrails to make it all compliant. #steelerection #steelstructure #rigger #crawlercrane #construction #boilermaker #structuralsteel #vicsteel Ducon Building Solutions @ Gertrude St Fitzroy
02.01.2022 This was a new stair and handrail that we recently installed around a lift shaft at the Moreland City Council depot for @notion_building_group . Erected with a crawler crane, we had it up in a couple of days #structuralsteel #steelerection #crawlercrane #steelstructure #steelstairs #boilermaker #steelfabrication #stairwaytoheaven @ Hadfield, Victoria
01.01.2022 This one is our Olympic Park/Reserve Pavilion project in Rosebud for Ducon Building Solutions. 31.5t of steel, mostly to the external facade of the Pavilion and a separate scorers box structure and stair. The whole job was galvanised too. Cant wait to see the final product! #steelies #vicsteel #structuralsteel #galvanised #rigger #kingfieldgalvanising #anchormark #allstaraccess @ Rosebud Football Netball Club
01.01.2022 This is our Hotel project for Chroma Group. It involved installing 3 Mezzanine platforms and 3 sets of stairs at level 14, to create 6 new hotel rooms at the top of the hotel. All columns and stair stringers had to be cut in half during fabrication to be able to fit in the goods lift, and then be welded back together once in the work area at Level 14. #rigger #rigging #steelfabrication #steelstructure #steelerection #vicsteel #penthouse #doubletreebyhilton #welding #boilermaker@ Melbourne - Flinders Street
Related searches
- CVM Cleaning
Businesses Local service Business service Cleaning service At-home service
+61 402 083 388
1971 likes
- Onsite Truck Wash
Businesses Local service Cleaning service At-home service
+61 433 550 787
27 likes
- Horse Rug and Leather Repairs
Businesses Local service Home improvement Pet service
+61 417 548 605
143 likes