Westkon Precast Concrete in Melton, Victoria | Industrial company
Westkon Precast Concrete
Locality: Melton, Victoria
Phone: +61 3 9747 3788
Address: 199 Ferris Rd 3337 Melton, VIC, Australia
Website: http://westkon.com.au
Likes: 587
Reviews
to load big map
23.01.2022 As part of the project we manufactured and installed a complete precast structure comprising of over 20,000 precast units. We achieved this through innovative engineering, design and production, followed by cutting edge delivery, erection and install methodologies that showcase our end-to-end capabilities. A pleasure as always working with Multiplex Construction, WSP Structures and Buchan Group.
19.01.2022 The West Gate Tunnel Project is mid-construction and Westkon proudly manufactured the beams for this huge job! This section is the West Gate Freeway outbound bridge over New Port Rail which will one day help you get from The bridge to Millers Road and Grieve Parade.
15.01.2022 The Carrum Station project is nearly done! Westkon manufactured the precast panels on this one and we are very proud of the outcome. Great work from all involved.
11.01.2022 Westkon is proud to have partnered with Built. to deliver AirTrunk’s latest data hall expansion. As part of the project we manufactured and installed a complete precast structure, including the data hall with high suspended floors and heavy loading capacity (enough to drive semis on) in less than 30 days! We achieved this through innovative engineering, design and production, followed by cutting edge delivery, erection and install methodologies that showcase our end-to-end ca...pabilities, opening up new possibilities in the data storage space. We always enjoy working with Built. enstruct group and Greenbox Architecture
09.01.2022 Here we have another advancement as part of the Victorian Government’s Level Crossing Removal Program Project, this time focussing on the Bell to Moreland area. Westkon is manufacturing 50 no. Precast Piers/Columns which will be used to support the elevated rail line. They vary in size with the largest weighing approximately 50 tonnes. This job is being completed for the North West Program Alliance in conjunction with John Holland and the Level Crossing Removal Project.
04.01.2022 Multiplex Constructions (Vic) Pty LTD has celebrated a milestone with The Premier Tower which has topped out at 246 meters above Spencer Street in the CBD. Westkon supplied the precast panels and columns for this project, and as always, we are more than happy to offer them our literal support.
03.01.2022 As part of the Victorian Government’s Level Crossing Removal Project, Westkon recently completed the manufacture and delivery of 4 no. Complete Precast Lift Pits required for the new Cheltenham Station. These units weighed approximately 50 tonnes each and the four lift pits were installed in one day. Our client, Southern Program Alliance, believed these precast units were a game-changer due to the substantial program time saved on site. The work was done in conjunction with Lendlease Engineering, Acciona.Australia, Coleman Rail, and the Level Crossing Removal Project.
Related searches
- Jess & Caz
Businesses Local service Home improvement Interior design studio
+61 412 322 433
323 likes
- MRJ Mowing and Home Maintenance
Businesses Local service Home improvement Gardener
+61 403 433 947
198 likes
- Chris McKendry auto electrical
Electrician Businesses Local service Home improvement Automotive repair centre
+61 427 335 269
447 likes
- Sam’s Mowing & Gardening
Businesses Local service Home improvement Product/service Gardener
+61 422 136 633
178 likes
- MKR Kitchens
Businesses Local service Home improvement Home decor Carpenter
+61 439 806 300
146 likes