Australia Free Web Directory

Zigcrete Constructions Pty Ltd | Businesses



Click/Tap
to load big map

Zigcrete Constructions Pty Ltd

Phone: +61 421 007 671



Reviews

Add review

Click/Tap
to load big map

22.01.2022 Garage slab and pathways all prepped and ready to go , nice early mud Again tomorow should make for an awesome day to finish this one off #Zigcrete #slabs #prepped #TZD



22.01.2022 Shed slab all poured today at Algester , cheers to the boys @psipumping for the push to make this one a cruisy pour #zigcrete #slab #concrete #shed #TZD

22.01.2022 Saw cut expansion joints all done today plus we knocked up this new fence and side gate . Can’t wait to get back to this one in a few weeks to finish it off with some Covercrete . #zigcrete #fences #gates #concrete #TZD

19.01.2022 Excuse the sealer drying patchy it was late in the day and cool .. Acid wash and seal completed today to finish off our monster shailer park project , so awesome to see this full front yard transformation come together , working with the boys @brisbanepaving was an absolute pleasure as always . Great to make another customer from @mtgravattvulturesafc @vulture_land super happy with there project at home . #zigcrete #driveways #stairs #earthworks #retainingwall #TZD



19.01.2022 Another pool surround finished off today with some Covercrete base coat and 2 flecks used on this move and simple but a great way to tidy up the plain concrete . #zigcrete #pools

18.01.2022 Big house garage extension footings all poured today all ready for us to come and prep up the slab ready for a nice fast turnaround on this decent size renovation . #zigcrete #slabs #footings #conventionalslabs #TZD

18.01.2022 Another decent sized shed slab all poured today with detached water tank , knocking them over like ten pins at the moment , must say I’m looking forward to December 18th #zigcrete #toobusy #work #sheds #slabs #TZD



17.01.2022 Big day of earthworks and concrete removal today to get these 3 crossovers and footpaths all prepped and ready to pour tomorow to finish off another great week . #zigcrete #prepped #concrete #driveways #footpaths #TZD

11.01.2022 Easing into this week after a couple of cancellations on jobs . Nice little bit of earthworks and prep and pour this little shed slab . Oh and then played golf and had a hole in one . #zigcrete #shed #slab #preppour #machine #earthworks #golf #holeinone #TZD

07.01.2022 Another decent sized shed slab and water tank slab all prepped. Ready to go bright and early tomorow . Massive amount of earthworks today to get this site cut to the correct height as per the customers request . #zigcrete #earthworks #digging #sheds #slabs #prepped #stepdown #5ammudisthedream #TZD

06.01.2022 Great day today getting these 3 exposed driveways poured , a total 19 cubic metres of kookaburra exposed by @geostoneholcim was used to complete the exposed stage off this project no me it’s onto 60 metre of pathway and the 3 crossovers looking forward to the next couple of days to see the end results Friday afternoon . #zigcrete #driveways #exposed #kookaburra #TZD

05.01.2022 Another pool surround and poured today on this super messy site with absolulty zero access . End results were great and it’s now ready for the tiler to come in and finish off the pool build . #zigcrete #pools #mess #concrete #broomed #TZD



05.01.2022 Back patio and pathway all poured today at our herston job . Looking forward to coming back to this one in a month to jazz it up with some Covercrete . #zigcrete #concrete #broomed #covercrete #TZD

04.01.2022 Day one of our big driveway crossover and footpath project at mount Gravatt . Big day of earthworks to get these 3 driveways all prepped and ready for some exposed aggregate tomorow morning . #zigcrete #exposed #sugarorrigasol? #kookaburra #TZD

04.01.2022 Earthworks all Done on this nice big pool surround , all prepped and ready to pour later in the week hopefully the rain does us some favours and doesn’t arrive as forecasted . #zigcrete @allclassqld #machine #digging #prep #TZD

04.01.2022 Covercrete completed today to finish things off on this pool surround we done 3-4 weeks ago , this one was done in a shake base coat with an off white and Byron blue fleck . Excuse the photos as our I phone broke and we had to take them on a disposable camera from the servo #Zigcrete #Covercrete #concrete #pools #TZD

01.01.2022 Sand ups all done on both our slabs at our camp hill project , and slab 1 all prepped and ready to go #zigcrete #slabs #prep #concrete #TZD

01.01.2022 Not a great forecast today so we decided to just do a bit of finishing touch work on a couple of our projects . We got the turf down at our @mtgravattvulturesafc project to finish it off . Just a tidy up in the morning and we are all done we can’t wait to sit on the new hill and watch the vultures in action #zigcrete #walls #concrete #turf #topsoil #wastedsoacetransformed #TZD

Related searches