Australia Free Web Directory

Zinzan Group Pty Ltd in West Gosford | Construction company



Click/Tap
to load big map

Zinzan Group Pty Ltd

Locality: West Gosford



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 A little lunch time drone footage of one of our Terrigal builds thanks to our painter @frazzledazzlepainting Luckily his painting is better than his drone skills!



24.01.2022 Progress shots of our huge Terrigal deck. We have used the Hardie deck product along with Blackbutt stair treads. Also loving the breeze block wall along the side of the stairs. It will be a big week this week, we sink a new shipping container pool in to the deck, watch out for more pics.

23.01.2022 Pool is in and decking 95% done. Love the design of this one by Craig @craigfarrugiabuildingdesign

20.01.2022 Sandstone crazy pave going down a treat in our Terrigal new build entry. Already looking good! @bryce_gearin__tiling creating art one sculpted piece at a time



19.01.2022 Beautiful day for steel installation on an extremely steep site at our Umina new build. #builtbyzinzan

19.01.2022 Another shipping container pool went in today at our Terrigal project. Now we can finish off the framing and decking ready for the Christmas festivities . Thanks too @shippingcontainerpools @

17.01.2022 Another one of our Terrigal new builds taking shape. Cathedral living space with a clever mezzanine area for the kids to play #builtbyzinzan



16.01.2022 Looking up at our 5 bed, 3 bath with a container pool build. Coming along nicely. #builtbyzinzan

13.01.2022 Another off form concrete wall under construction for one of our Terrigal new builds. Watch this one come together over the next few months. It’s a cracker design by @mlukicarchitect #builtbyzinzan @ Terrigal Beach

12.01.2022 Afternoon light appreciation on site at our Terrigal new build #builtbyzinzan

10.01.2022 Another day of big machines on site, this time in Umina. These piers are an average of 7m deep and will be the foundations for a new two storey home. Thanks guys for a big day. @seemyholes @redpumpsconcrete @stuartconcreting #builtbyzinzan @ Umina Beach, New South Wales

09.01.2022 First floor framing underway at one of our Terrigal jobs. Cutting our frames onsite instead of using prefabbed frames for this one. #builtbyzinzan



07.01.2022 Good progress at our Umina New Build. The ground floor is in and the frames have been craned up. The photos don’t do the slope of this sight any justice. This one is super steep!!

07.01.2022 First time using @jameshardieau #hardiedeck Going down well, can’t wait to see the finished product.

03.01.2022 Getting just the slightest bit excited about seeing the garden between the main house and the granny flat of our Terrigal New build come together. Who knew being involved in plant selection could be such a rush! #builtbyzinzan

02.01.2022 So glad we were able to get these guys that poolside Christmas they wanted just in time! #builtbyzinzan @wolfe_and_fox

Related searches