Australia Free Web Directory

A.J.Macpherson Constructions | Contractor



Click/Tap
to load big map

A.J.Macpherson Constructions

Phone: +61 413 475 391



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 En-suite at our Albany Creek project. Before photos.



24.01.2022 New aluminium balustrading installed today at our job in Enoggera. What a change this retaining/fencing has made to the facade of this recently completed build. @ Enoggera, Queensland

22.01.2022 Special needs bathroom in Cannon Hill. Handing over on Monday. Two wheel chair bound people moving into house on Monday. Also on scope, demolish two walls for bigger bedrooms as well as installing 920mm wide doors, new vinyl plank flooring to three bedrooms and remove a bathroom. A lot of demo on this one .

22.01.2022 New and old pergola. The fly over insulated roof makes this space feel so much bigger than it is.



21.01.2022 Kitchen before at our Albany Creek project.

21.01.2022 Kitchen after photos. We went the same design here with some modern changes. The biggest was connecting the new pergola with the kitchen. We continued the stone from inside to outside to create a servery and installed a new stacker window to really make this an entertainers kitchen.

21.01.2022 The main bathroom at our Albany Creek project. Before photos.



20.01.2022 Shower screen installed at our Bracken Ridge job today. Great feeling when the job is complete!

17.01.2022 VJ ceiling, 2 x bedrooms (re frame, straighten and re sheet) ,1 x window install, 1 x aluminium door/window installed, unpainted cladding and trims at job in Carina Heights helping owner builder finish his house. Have done about 1 week a month for the last three months. Garage, handrail and back balustrade to complete hopefully by years end. Rookie error not getting any before photos. @ Carina Heights

17.01.2022 Current en-suite Reno in Bracken Ridge. Before photos first. Finishing off touches and shower screen to be installed. Same layout, just changed the window and added cavity slider. @bradnamswindowsdoors @ Bracken Ridge, Queensland

17.01.2022 Main bathroom after photos. We made a few little changes here. Deleted a swinging door for a cavity slider. Three niches and some changes with the vanity. How good does the shelf above the end of the bath look? This is one of my favourite features of this bathroom. We recessed the shaver cabinet into the wall to gain that little bit of extra depth for storage. ... The client wanted a frameless shower screen in this bathroom and it looks stunning.

16.01.2022 Hand cut kwila stairs and blue gum flooring on a project in Paddington we were contracted to finish off



14.01.2022 Frames almost ready for plumbing and electrical rough inns at my job in Mount Mee. A few nogs still to install as well as bracing sheets. Then onto noggins for plastering and straightening. @ Mount Mee

14.01.2022 New lights, front door and crim safe security screen installed in entry at our Albany Creek project. Primed and ready for painter! #renovations #brisbanebuilder #carpentryskills #glazing #modernisation #leddownlights

12.01.2022 Nice little deck repair knocked over earlier in the week in Redcliffe. Balustrades (stainless steel wire) to be completed by client.

12.01.2022 Some progress shots of our concrete block retaining wall/fence in Enoggera. Footings poured yesterday. @ Enoggera, Queensland

11.01.2022 Recent job in Northgate. Replaced rotten treads, stringers, balusters and handrails. Replaced with hardwood for a longer life.

10.01.2022 New ship lap fence installed in Enoggera. Completed October last year.

10.01.2022 Block layer core fill now ready for render, painter and aluminium infill panels at our job in Enoggera. @ Enoggera, Queensland

10.01.2022 Deck and flyover roof extension in Mitchelton #brisbanebuilder #deck #renovations #flyoverroof

07.01.2022 Progress of job at Mount Mee this weekend. This one is coming together nicely. @ Mount Mee

06.01.2022 Some progress shots from our Reno at Albany creek (all from last year). This Reno was completed in stages so clients could still occupy house with as little disruption as possible.

05.01.2022 Rebuilt a fernery for a client in Thornlands. Existing was built with a level top and we re built it with a 9 degree pitch.

03.01.2022 Garage renovation in Thornlands. We repaired/replaced rotten window sills with custom composite timber (so it doesnt rot). Extended garage 1.5m, installed under deck roof (covered up with fibre cement sheeting) relocated louvre window from other side of garage, created a visual termite barrier to accompany the existing termite bate system in use. We also framed up openings for panel lift garage doors to be installed in two weeks. Client to stain/paint himself.

02.01.2022 En-suite after photos. We kept the design pretty much the same tweaking a few things. Added a cavity slider door, two basins and floor to ceiling tiles.

02.01.2022 Laundry before and afters

02.01.2022 Recent office refurbishment at the Gold Coast.

Related searches