25.01.2022 @jimmyshore11 just trying out our new pizza cutter! Looking forward to getting this new toy out in the open ground and seeing what it can do #chaintrencher #kubota #levelcrossings



24.01.2022 A few photos from our works on the Regional Rail Link

22.01.2022 Some foundation works by the lads out at the new Beaconsfield Sub Station site for the Skyrail Project @fezdizzle @gricey25 @jimmyshore11 @kris_shore23 @steveshore21 @itsdolss #topjoblads #neatasapin #concretelife #railindustry

22.01.2022 Here’s some photos of our brand new Drill Truck & Float that was finished today. We’ve got a place for everything in there and should be able to carry whatever we need to get the job done. Been a long time in development and a big thanks to our in house mr fix-it Rosie for getting it all put together so well. Will be excited to see it head out to its first project very shortly #railindustry #directionaldrilling #theshores #kubota #vermeer #greatrig #fuso #allsystems @steveshore21 @kris_shore23 @jimmyshore11



22.01.2022 We’re on the lookout for very competent and experienced Excavator Operators to join our team. Great pay and conditions for the right candidates, must have the following:- A minimum of 5 years experience in Excavator operation The ability to operate around live services including gas, water, power and signalling cables A current Rail Industry Worker card (preferred, but can be arranged for the right candidate)... Be looking for a full time role within an expanding team Be an extremely efficient operator but most of all be very safety conscious and have an ability to operate in tight areas within the live rail environment If you or someone that you know may fit what we’re looking for please feel free to send us your details and we’ll be in touch Cheers Legends @steveshore21 @kris_shore23 @jimmyshore11

22.01.2022 New Truck & Positrack ready to roll!

22.01.2022 A few photos of some works that we completed for #vline down between Sale & Bairnsdale. Boys out working hard from dawn to dusk in the heat, the rain, the wind or whatever Mother Nature decides. #railindustry #kubota #allsystems #theshores #lovewhatwedo #completedworks Photo Cred to H.Hetherton



21.01.2022 Another new addition to our Fleet, our first 4x4 Tool Truck! We spent months and months on the design of this and with the help of our mad scientist Rosie, we managed to include everything from a fridge, bbq, generator, fuel cell, water tank and pump, air compressor and a HIAB crane. It’s always our mission to give our teams the best tools for the job so they can work smarter not harder! #allsystems #theshores #gangtruck #addittothefleet

20.01.2022 Our new toy in action. This will make the job of unrolling coils of pipe for our Level Crossing works so much easier! It pays to work smarter and not harder, especially with the amount we’ve got in front of us #worksmarter #pipespinner #axlecounters #allsystems #levelcrossings #railindustry @jimmyshore11 @kris_shore23

20.01.2022 Some great photos taken by the official Level Crossing Removal Photography team. This time out on the Bell to Moreland site between Coburg and Brunswick #theshores #allsystems #railindustry #railshutdown #hirail

18.01.2022 Some great work by our crew on Saturday out at a rail shutdown at Merinda Park Station. McConnell Dowell were replacing a section of track and sleepers and engaged us to install some new under track drainage in the form of concrete box culverts and a new head wall. Great job by @lukewilson810 @gricey_25 @pauliseyfs @65funky Powelly #theshores #allsystems #railindustry #whatlongweekend #drainage #centimetreperfect

18.01.2022 A nice bit of media within this months CEO magazine. A big article on Metro Trains CEO Andrew Lezala, and the heads of Sam Wilson, Kris Shore and Justin Charylo made it into our ad! Good job lads!



18.01.2022 A few more action shots of some works that we completed for V/Line down near Bairnsdale. Some tough conditions with rain, heat, wind and so on but the crew did an amazing job. Can be hard working away from home at times but it’s great to get out and see a lot of country Victoria #vline #allsystems #theshores #railindustry #ndd #directionaldrilling #kubota #bairnsdale

17.01.2022 Always watch a sunset at least once a day..... Photo cred to @darcyspurling #sunsets #allsystems #railindustry #theshores #warnamboollineupgrade

16.01.2022 Had a busy day down at Vic Roads getting our new Mobile Lunch Room and Mobile Site Office registered. We’ve got some great projects on the books and plenty more on the horizon so we decided to make it easier for our crews to be able to set themselves up comfortably on site. Big thanks to #WorkCaravans in Queensland for doing such a great job with our build #theshores #railindustry #mobileoffice #mobilelunchroom #allsystems

16.01.2022 Another great job by our teams today, this time at Belgrave and Upper Ferntree Gully Stations for Metro Trains. Mother Nature had it in for us today that’s for sure! Great job lads #allsystems #theshores #kubota #terex #railindustry #greatworklads

15.01.2022 Lucky enough to visit the No-Dig expo at the Melbourne Exhibition Centre today, where they had lots of awesome toys like this one to check out. For anyone in the Earthmoving game I’d recommend getting in there for a look, definitely some cool stuff! @steveshore21 #mydreamrig #vermeer40x55 #hdd

14.01.2022 And that’s a wrap for our works at Kananook Sub Station for the Level Crossing Removal Project. A very busy and hectic past 3 months but a great effort by our team on site which was very well lead by @darcyspurling and @lukewilson810 with great planning and coordination by @jimmyshore11 and @kris_shore23. Finished on Friday and our new Project kicks off next Tuesday so no time for a rest! A job well done by our entire crew #railindustry #kananook #kubota #terex #substation #colemanrail #lendlease

14.01.2022 What a beautiful place to be Locating Underground Services #mountmoriac #ndd #crackingday

13.01.2022 The new addition to our fleet! Non Destructive Digging Unit (NDD) that's going to let us locate and expose buried underground services without the chance of any damage. Just needs the sign writing done and it'll be straight out to work!

11.01.2022 Very happy and proud to be a part of this massive project for Melbourne, the Metro Tunnel. We’re currently working on a huge 2 week rail closure throughout the Footscray area and the boys have so far done a brilliant job in some fairly awkward and tight areas. Almost 1000 people working around the clock on this project at the moment, the scale of the works involved is just massive! #allsystems #theshores @kris_shore23 @jimmyshore11 @steveshore21

11.01.2022 Another huge weekend of works completed by our crews out at Lilydale for the Maroondah Highway Level Crossing Removal Project. We installed 2 bores under Maroondah Highway, trenched and installed conduits through the Station Carpark and Metro Drivers Facility and performed Service Locating and NDD works. Our crews worked around the clock starting at 7pm on Friday night and finishing at 7pm on Sunday night. A super effort by our entire team!! #allsystems #theshores #railindustry #lilydale #levelcrossingremoval #boringanddrilling #ndd #servicelocation

08.01.2022 We’ve had a very busy last couple of weekends working on the High Street-Reservoir Level Crossing Removal Project for John Holland. Our teams on site have done a fantastic job and been coordinated very well by @jimmyshore11. Also found a place on site to get our new site office setup #railindustry #kubota #ndd #siteoffice #theshores #allsystems

08.01.2022 Some more photos of our finished product at Kananook Sub Station on the Southern Program Alliance Level Crossing Removal Project for Lend Lease & Coleman Rail. All asphalt, concreting, fencing, gates and drainage done by our guys on site. Great job by the whole team!

07.01.2022 NDD truck out on site and ready to go! For anyone looking to book this for any jobs that you may have please call Steve on 0400766751

06.01.2022 Any skilled Operators out there looking for a job? We're currently in the market to employ skilled and competent Excavator Operators to join our Company. If you know anyone that may be interested please feel free to share this ad. Cheers

05.01.2022 We’re looking to add some experienced Excavator Operators to our growing team. We are based in Braeside but have work throughout the Melbourne Metro area and also Country Victoria. Works are specifically in the Rail Industry so plenty of upcoming and ongoing work. Experience is preferred but not essential, if you or someone you know might be keen then please forward a CV to [email protected] #allsystems #railindustry #excavatoroperators #sendacv

05.01.2022 We’re looking to add some more people with skill sets to our team. Excavator Operators, Crew Leaders/Leading Hands & Truck Drivers. Are you interested or know someone that might be? Feel free to make contact via email at [email protected] or DM us on our Instagram or Facebook pages. Great pay and conditions available and plenty of possible contracts and work opportunities on the horizon. Rail experience and current rail certification is preferred but can be organised for the right candidate. Family owned and operated business with a great reputation and a great team to join. #allsystems #theshores #railindustry #joinourteam

04.01.2022 We’re on the lookout for some people to join our team, Excavator Operators, Team Leaders, Skilled Labourers and Supervisors to join our ever growing and expanding crew. We work within the booming Rail Industry both in the Melbourne Metro and also country Victoria. Current Rail Industry Worker accreditation is preferred and experience is always a bonus. If you or someone that you know could be a great candidate please email details to [email protected] or send us a DM #theshores #allsystems #railindustry #hiring #expandingthebusiness #joinourteam

04.01.2022 Getting out and enjoying the sunshine on Saturday for #VLine at Kilmore East. Installed a new signal foundation so that a major track upgrade can take place later in the year. Makes it so easy having great machinery to use and we ended up having all four of the Shore boys on site for the first time in a long time! #allsystems #kubota #terex #railindustry #theshores

04.01.2022 New NDD Rig just landed. Straight out to work on Monday #ndd #serviceproving #spoutvac #addittothefleet @jimmyshore11 @kris_shore23

02.01.2022 Our team down in Colac getting the job done

02.01.2022 And we’re off with our new venture! We’ve just made the move into Directional Drilling which is going to let us be self sufficient from start to finish on our projects. Some training up at Steve’s block for the past couple of days has been great and the boys are ready to roll. A big thanks to the guys at Vermeer in Derrimut for the great service #vermeer #drilling #allsystems #boof #wayneo #railindustry