Australia Free Web Directory

Artisan Of Stone | Businesses



Click/Tap
to load big map

Artisan Of Stone

Phone: +61 419 255 216



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Desalination work on Fort Denison Sydney Harbour more progress photos to come



25.01.2022 Turtle for a park at Kurnell.

24.01.2022 A spot of lead lettering

23.01.2022 Traditional lime and sand lath and plaster to reinstate wall using original materials used.



21.01.2022 Lithgow James street bridge stone replacement has been completed and this refurbishment has almost come to a end. More photos to come once all works had been finalised.

21.01.2022 The last stir and let it finish slacking down

20.01.2022 Lithgow James street railway bridge stonemasonry work. The works consisted of removing all of the hard cement mortar joints and patches. Cleaned all the stone with a hot wash. Stone stabilisation with stainless steel pins. Over 300 helicoil bars at 1m in length to tie over all the cracks. All joints and patches are lime mortar with a local washed river sand. The stone parapet stones on the ends of the bridge were lifted up and pinned back into alignment. 1 parapet stone was replaced due to the condition it was left in.



19.01.2022 Repairing traditional rendered sand stock brickwork with shell lime and sand mix to match existing materials.

19.01.2022 Congratulations to this years winners and a big thank you to Sydney Trains, Abergeldie, Sheerji Consultant and Aurecon to help become one of those winners on an exceptional job that is the James Street bridge, Lithgow.

19.01.2022 Elizabeth Bay house lime patching and Desalination f basement level ,prep for step indents. Fixing ground Cast iron grates

18.01.2022 The first stage in making shell lime

18.01.2022 stone indents,replacements



17.01.2022 AoS picked up these big stones (over 3m long) this morning for Beecroft War Memorial.

17.01.2022 Australians Memorial Walk - North Head Sanctuary Manly finished installing plaques doesn’t look as good after the bushfires.

16.01.2022 The next stage of creating shell lime putty

16.01.2022 Protecting lime mortar patches in catastrophic fire conditions on the James street railway bridge in Lithgow.

14.01.2022 Dismantling Beecroft War Memorial

Related searches