23.01.2022 Malabar project rising. The upper floor framing is being built, with considerable detail to ensure we are able to install the air right envelope once the frame is complete.



23.01.2022 Things you find under existing floors. A pre floor installation inspection revealed a spiders web of old cables. Always pays to check.

23.01.2022 Tamarama Pool pour

23.01.2022 Malabar project. Detail demolition of the current structure. Asbestos sheeting was found sandwiched above the plasterboard ceilings. This is common, as it is cheaper just to cover it and not to remove. ... The sheeting was sprayed with PVA adhesive to ensure all fibres are bonded, prior to be removed and disposed of at a licensed facility. Common to coastal homes, the existing wall ties are corroded. This will be remeadiated before construction begins.



20.01.2022 Isnt this the most beautiful restomod of a home. New meets old in Greece.

20.01.2022 Welcome 2020. Happy and prosperous new year to all. Tamarama Busy bees over the break. Concrete block retaining walls completed, ready for formwork to start this week.

19.01.2022 Rain, glorious rain. It must be special circumstances for a builder to enjoy the rain. It has holted us working on-site today, but it is so needed everywhere.



18.01.2022 Randwick project. Services rough in continues, with the boys from Prestige Cabling Group wiring the electrical and Star aircondioning installing the Daikin vrv units. Next is the Control 4 home automation system rough in.

18.01.2022 330 Birrell street Bondi Ready to handover to my great clients. Very proud of my team, another great home delivered on-time.... Some of the great trades and suppliers for this project: Halex design all angles plumbing nicco joinery central coast shopfronts havwoods timber floors Maroubra building supplies Create concrete Alpha omega painting DSK joiners Rallis timber

17.01.2022 We only use the best - Hilti No short cuts here, Atlantis building construction quality.

17.01.2022 Malabar project ready to go.

16.01.2022 The beautiful randwick home getting closer to handover. Only 2 weeks to go and counting.



16.01.2022 Richard from Red rock design created this model for or Tamarama project. This enables the client to actually visualise the project. Lets see what the real home turns out to look like.

14.01.2022 Birrel street manor Sneak peak of the transformation. 2 days to handover.

13.01.2022 Glass pool wall finally in! After 2 previous aborted attempts due to glass defects, today we successfully installed 3 laminated 40mm thick panels. Access was extremely tight, with the 4liftn crane truck squeezing in with mm to spare.

13.01.2022 We are about to embark on a very exciting project. Once competed, this fully renovated home will achieve Passivehaus standards. This is a world leading standard in energy efficiency and clean Air. Watch this Space.

12.01.2022 Taking shape. The home has been dressed in Vic ash timber cladding. Pvc, double glazed windows installed. ... Airtight Pro Clima intelligent wrap competed. This ensures that the home is air tight, with every detail sealed. To ensure the air tightness, a Blower door test was completed, with the home being tested under vacuum and pressure of 50kpa. The air loses were then measured, with a target of N value of 3. We acheived 1.7, a great result. The home is super insulated and this very quite. To further audit my teams work, a thermal imaging camera was used to identify any possible air leaks, again passing with flying colours.

12.01.2022 MALABAR home rising from the ground. Even though the weather has been WET, we are still moving along with the structural frame. The views overlooking Malabar Bay are spectacular.

12.01.2022 https://youtu.be/CasrjYhZB1M

10.01.2022 https://m.facebook.com/story.php?story_fbid=10220934440853760&id=1322882353

10.01.2022 Tamarama suspended garage roof slab ready to pour tomorrow. Hoping the rain comes after lunch

08.01.2022 Starting a new project in Tamarama. Double garage and storage in full concrete with a glass walled lap pool built ontop. This will compete an already great home.

08.01.2022 Slab completed. The weather goddess looked after us today. Now to start the glass walled swimming pool.

07.01.2022 Wow. Stunning in black

05.01.2022 Tamarama Almost there. Glass Pool wall going in next week with pool fitout competed shortly after. ... Stay tuned

04.01.2022 Tamarama progress update The project is ready for the construction of the pool to begin. Planter boxes built and waterproof and the under pool slab has been waterproof up ensure no issues within is life.

04.01.2022 Clovelly build Making good progress on my clovelly build. This is a very detailed project, that mixes lots of exposed steel, hardwood timber and metal wall cladding.

04.01.2022 Tamarama Underpinning and bulk excavation is now complete. Prepping for the slab to pour before Christmas.

03.01.2022 Clovelly - the beauty of natural timber. Spotted gum exposed beams, flooring and stairs.

03.01.2022 Old, rusty iron lintels have been left in during a previous renovation. These well be removed and repaired.

03.01.2022 Bathroom makeover. We built this beautiful home 10 years ago, and it was time to reimagine the powder room. Beautiful tiles from Amalfi Tiles, transformed the look totally.

02.01.2022 Project update The current circumstances are proving difficult for everybody, but for the building industry, outs business as usual (sort of). Social distancing is bring practised, as well as regular hand washing.... Stay well everybody. Tamarama Pool is being prepared to be poured on Wednesday. The garage had been cement rendered ready for final finishes. Services (water, gas, power, comms) located, ready for the removal of the existing concrete to be replaced with landscaping.

02.01.2022 And we are off!

02.01.2022 Most people will look at the size, BUT Look at the difference in the growth rings, today's timber is so young and therefore much less stable.

01.01.2022 Paddington service work. We not only build, but maintain our clients properties. New sewer line and gravel drive way.

01.01.2022 Malabar. House frame is done and wrapped in Pro Clima mento plus water proof wrap. Premium Quality german product. This wrap lets the building expel vapour but it locks out water!

01.01.2022 Back to school! Undertaking the Passive house builder training to be able to become a certified Passive house builder. Due to COVID19, it is all done via Zoom remotely. ... Building ecologically and efficiently is definately the future. Stay tuned!

01.01.2022 Clovelly project update. Bathrooms tiled, knauf insulation installed, plasterboard sheeting complete. Timber floor next!