Australia Free Web Directory

Blake’s Plumbing & Contracting | Local service



Click/Tap
to load big map

Blake’s Plumbing & Contracting

Phone: +61 498 150 597



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 We did something different the other day cleared and levelled this over grown area and spread some top soil for new turf!



25.01.2022 A bathroom, laundry we are doing for north south building just out of Blayney!

24.01.2022 Today we located and repaired a broke 2inch Polly line under concrete.

24.01.2022 Another carport we have done recently!



24.01.2022 The 1000L grease trap we put in in Bathurst for the commercial kitchen we are doing! We dug the hole installed the grease trap And also did the concreting!

23.01.2022 This week we worked on restoring an old tiled roof to a fresh new iron sheet roof. We removed the old tiles, replaced with iron sheets and completed facia, ridge-cap and guttering all in just 2 days. Thinking of redoing your old and tired roof? Call us to book in for an inspection and quote today!

23.01.2022 Last Sunday we pulled this little roof off and replaced the battens, sarking and then re screwed original sheets back on! We did this because the old screw had leaked and caused the timber battens to rott and the screws werent holding anymore!



22.01.2022 We did another reroof today came up a treat!

22.01.2022 A customer asked me how much it cost to do this job.... I answered him: $ 1500 He said: So expensive for this job? I asked: How much do you think it would cost you? He answers me: $ 800 maximum... That's a pretty simple job right? !"... - For $ 800 I invite you to do it yourself. - But.... I don't know how to. - For $800 I'll teach you how to. So besides saving you $700, you'll get the knowledge for the next time you want - It seemed right to him and he agreed. - But to get started: you need tools: A welder, grinder, chop saw, drill press, welding hood, gloves etc... - But I don't have all these equipment and I can't buy all of these for one job. - Well then for another $300 more I'll rent my stuff to you so you can do it. - Okay, he says. - Okay! Tuesday I'm waiting for you to start doing this work - But I can't on Tuesday I only have time today. - I'm sorry, but I'm only available Tuesday to teach you and lend you my stuff. Other days are busy with other customers. - Okay! That means I'm going to have to sacrifice my Tuesday, give up my tasks. - I forgot. To do your job yourself, you also have to pay for the nonproductive factors. - That is? What is this?" - Bureaucratic, tax, vat, security, insurance, fuel etc. - Oh no!... But to accomplish these tasks, I'm going to spend more money and waste a lot of time! - Do you have them? You can do it to me before?" - Okay! - I'll make you all the material you need. Truck loading is done Monday evening or Tuesday morning you'll have to come by 6 loading the truck. Don't forget to be on time to avoid traffic jams and be on time - At 6??? Nope! Too early for me! I used to getting up later. ... - You know, I've been thinking. Y ' all better get the job done. I'd rather pay you the $1500. If I had to, it wouldn't be perfect and it would cost me a lot more. When you pay for a job, especially handcrafted, you pay not only for the material used, but also: - Knowledge - Experience - Study - Tools - Services - Time to go - punctuality - Accountability - Professionalism - Accuracy - Guaranteed - Patents - Sacrifices - Safety and security - Payment of tax obligations No one can denigrate other people's work by judging prices. Only by knowing all the elements necessary for the production of a certain work can you estimate the actual cost. I did not write this dialogue, but am sharing it to support craftsmen and entrepreneurs.

22.01.2022 Another full house roof we are doing at emu swamp! Keep your eye out for the finished product!

21.01.2022 An old tile roof clean and a few little gas jobs I have done lately

21.01.2022 This is our latest investment, A 60m Wifi push camera! We can inspect, video & take photos of your sewer or stormwater pipe, making it easier to locate and find blockages or broken/cracked pipes!



20.01.2022 Today we did a little bit of pressure pipe work for Swimplex at centre point Blayney

18.01.2022 Recently we unblocked a sewer at Blayney Cold Storage. We located the problem of a broken pipe which was caused by tree roots growing into it, as you can see by the footage using our sewer camera. Next step was to dig it up, replace the broken pipe and its good as new!

17.01.2022 At the end of last week we were at Cumnock doing a re roof on this old cottage, Hynash Group removed the old asbestos roof and we re battened papered and sheeted in just two days before the rain came! Thanks heaps team, Jake Smith Tom Hoadley and TK Rural Works

17.01.2022 Just a couple of sewer chokes we have done latterly

14.01.2022 A little roof we finished yesterday over a sunroom that was leaking. To prevent leaking we increased the pitch and added some insulating as well!

14.01.2022 A wood heater flue that I replaced earlier this week

14.01.2022 Another water Leak under concrete today we located and repaired with a happy customer!

14.01.2022 A little slab we dug out boxed up, got Jamie from flash concert to place and finish for us came up a treat!

13.01.2022 Preparing a slab for Brad built construction today

12.01.2022 Out with the old and in with the new! Replaced a little zip heater with a new 315L aquamax

12.01.2022 Removed an old stormwater pit and replace with a new one to prevent the trip hazard! Also replace a bit of foot path that was all cracked and uneven!

12.01.2022 Before and after pictures of a laundry Reno done in 12hrs! Thanks to MR TILING & TH Electrical for all your help!

11.01.2022 A couple of little storm water jobs we did today for blayney foods, a pit with a hole in it and a broken 225mm stormwater pipe!

11.01.2022 The latest set of rubble drains we did last week! 72m long 1m wide .6m deep with a distribution box to eevenly distribute the water to each trench!

09.01.2022 Today we did a little 3.6x3.2m slab for a garden shed.

07.01.2022 A new septic tank and rubble drains just out of Blayney! Replaced the old brick septic that had no rubble drains at all to new tank and 60m of rubble drains!

07.01.2022 A little rubble drain we did not long ago in Milthorpe!

07.01.2022 Today we were at Mandurama. We dug, installed, connected to existing septic tank and filled in 50m long 1m wide of rubble drain!

07.01.2022 A little tight access fence job in Bathurst for Bradbuilt Constructions

06.01.2022 Removed and old and installed a new solar hot water today in Woodstock for orange electrical!

06.01.2022 Today we installed a collection well and pump for a shower kitchen and laundry that was lower then the septic tank so that we can get all the waste water to the septic!

05.01.2022 A new 6x9 carport out at kings plains, that we built from the ground up!

05.01.2022 Thanks heaps to Alpha signs Bathurst for the great sign writing came up a treat!

05.01.2022 Another RE roof we have done in between all the rain we’ve had. Removed old sheets, RE battened, New Roof, Ridge capping, Facia cover, flashings and gutter!

05.01.2022 15 panels of colourbond fence we did late last week!

05.01.2022 Last week we started and finished the plumbing on this portable house, We did internal drainage, excavation and external drainage, connected water, installed hot water system, installed gas regulator for gas stove and hot water and we also installed the wood heater!

05.01.2022 A few rural jobs I have done lately!

05.01.2022 Today and yesterday we were at Mudgees new hospital connecting some 150mm gal down pipes into storm water pits in the courtyard!

04.01.2022 A nectar wood heater we flued and sealed last week!

04.01.2022 A commercial kitchen we have been doing in Bathurst, with a 1000L grease trap to follow #bradbuiltconstructions

03.01.2022 Over the weekend we drove to the gold cost and back to pick up a 2.5 ton excavator! If you need any work done just let us know!

03.01.2022 A new house septic system out at Trunkey we did a couple of weekends ago. If you have a problem with your septic let us know and we can fix it for you!

03.01.2022 Late arvo hot water system we did yesterday from old storage to new infinity!

01.01.2022 Finished this carport today!

01.01.2022 Over last few weeks we have connected the plumbing to a potable house, started a bathroom reno, prepared a slab and started a carport!

Related searches