Calder Maloney in Brisbane, Queensland, Australia | Engineering service
Calder Maloney
Locality: Brisbane, Queensland, Australia
Phone: +61 409 496 390
Address: GPO Box 212 4000 Brisbane, QLD, Australia
Website: http://www.caldermaloney.com
Likes: 72
Reviews
to load big map
20.01.2022 Hello all, Check out the new photos uploaded from the construction of the Mt Carlton Project. If you'd like to see an overview of the whole plant, you can view the fly through of the Mt Carlton CAD Model here: http://www.caldermaloney.com//mt-carlton-flythrough-video-5
18.01.2022 Photo's documenting the construction of the Mt Carlton Flotation Plant. The plant was officially opened in April 2013. Calder Maloney completed the Engineering Design and Procurement for the Project. To see a fly through of the CAD model produced by Calder Maloney visit: http://www.caldermaloney.com//mt-carlton-flythrough-video-5
07.01.2022 Photos from Esther Talin during her charity work in the Philippenes!
05.01.2022 This Album has photo from the Sal de Vida (salt of life) project located at the Salar del Hombre Muerto (dead man's salt plain) in Salta, Argentina. The project will produce 25,000 tpa of battery grade (+99.5%) Lithium Carbonate, which is produced from brine extracted from beneath the salar. The brine is concentrated in solar evaporation ponds, then undergoes a series of process separation operations (including solvent extraction, ion exchange, precipitation and recrystallis...ation) to produce the final product. Maloney completed a feasibility study on this project earlier this year. You can read more about the project at: http://www.caldermaloney.com/projects
04.01.2022 This is a photo of the test ponds dug for the Sal de Vida (salt of life) project at the Salar del Hombre Muerto (dead man's salt plain) in Salta, Argentina. The project will produce 25,000 tpa of battery grade (+99.5%) Lithium Carbonate, which is produced from brine extracted from beneath the salar. The brine is concentrated in solar evaporation ponds, then undergoes a series of process separation operations (including solvent extraction, ion exchange, precipitation and recr...ystallisation) to produce the final product. Maloney completed a feasibility study on this project earlier this year. You can read more about the project at: http://www.caldermaloney.com/projects
Related searches
- DMK Engineering Pty Ltd
Home improvement Construction company Engineering service
+61 8 8723 0550
9 Bodey Circuit 5290 Mount Gambier, SA, Australia
954 likes
- DMP engineering
Businesses Engineering service Science, technology & engineering
+61 478 647 456
164 likes
- Dos Santos Building Management Services
Engineering service Management Service Interior design studio
+61 417 985 210
183 likes
- DTD Engineering Pty Ltd
Engineering service Commercial and industrial
+61 2 6043 1560
12-18 Hoffman Rd 2640 Thurgoona, NSW, Australia
456 likes
- DTJ Contracting Pty Ltd
+61 431 319 330
793 Boundary rd 4110 Coopers Plains, QLD, Australia
509 likes