Australia Free Web Directory

Carstairs Concrete Services Pty Ltd | Home improvement



Click/Tap
to load big map

Carstairs Concrete Services Pty Ltd

Phone: +61 401 009 886



Reviews

Add review



Tags

Click/Tap
to load big map

24.01.2022 Raising of concrete retaining wall posts and sleepers, with shed floor pour and exposed aggregate paths and driveway to follow in Mt Barker.



24.01.2022 We poured this 71sqm shed pad for Pam and her husband last week, all ready for shed installation

24.01.2022 A second driveway we prepared and poured for Allecia and Jason out at Mannum with a upstand kerb as a retaining wall to help take out the sharp angle of the driveway, turned out mint

22.01.2022 A shed we completed 6m x 9m, we did the earthworks (40 ton), shed build and poured up at Walker Flat for Matt and Jess



22.01.2022 We returned to Colrae Farms today at Callington to pour 2 more seed silo foundations, each one of these silos can hold 118 tons of seed200mm thick 32mpa concrete with double layer of sl72 steel mesh.

17.01.2022 A 108sqm shed and apron we poured for Matt & Julie at Murray Bridge last week with 25mpa concrete strength, sl72 steel mesh.

16.01.2022 We were contacted by Ann to prep and pour 65sqm of patio, path, clothes line pad, bin and gate path and driveway infill, thanks Ann and Alan enjoy your new concrete.



16.01.2022 54 lineral meters of kerb and water table we poured and completed for Ridleys SA at Unity College’s car park in Murray Bridge recently.

15.01.2022 Carstairs Concrete Services Pty Ltd are proud to announce we have increased our sponsorship with the Mypolonga Cricket Club this 20/21 season, good luck to all players in all the grades, go get’em Tigers

15.01.2022 This 117sqm shed floor we completed for Paul and Briony with sl82, 32mpa concrete strength with the whole job turning out amazingly

13.01.2022 54sqm Shed with apron and patio area we poured today in Murray Bridge. 25mpa. Sl72 mesh

12.01.2022 Our pour on Saturday at Fullerton with Premix’s Ghost Exposed Aggregate



12.01.2022 120 sqm of Premix’s Ghost 32mpa exposed aggregate. We completed all earthworks and sub base with sl72 steel reinforcement mesh, saw cuts, acid wash and 2 coats of clear sealer and it turned out stunning

11.01.2022 A driveway we completed in Echunga with Boral galaxy exposed mix

10.01.2022 We returned out to Hartley last week for another repeat client, Vicki. Where we poured a small hay shed with an extended apron for the installation of shed sliding doors.

10.01.2022 50sqm shed we poured at Walker Flat this week, we had to dig out 10ton of sub base to get the right heights.

09.01.2022 55 sqm of driveway and front path in Boral galaxy exposed mix in Mt Barker Ashton Hills.

09.01.2022 Big shout out to Josh from Prestige Sticker Co for updating one of our vehicles stickers, we love to support local businesses, hit them up for all your stickers and much more

07.01.2022 Taryn contacted us to help out with some concrete for her camper trailer and trailer parking, we excavated out 10 ton of spoil, prepped and poured 55sqm.

07.01.2022 166sqm of plain textured finished concrete we completed in Goolwa for Ash today, we also completed the earthworks with 16 ton of rubble for the sub base.sl72 and 25mpa Thanks Ash for using our services and enjoy your new driveway and perimeter paths

06.01.2022 We recently helped Ridleys and Camco with some concrete works at the new Murray Bridge Rowing Club with 291 meters of concrete edge, grey footpath and pedestrian ramp and some exposed aggregate along the river front

05.01.2022 We prepped and poured this 9x6 shed with a 6x6 apron for Ryan a few weeks ago, we had a few rain showers blow through but the finish still turned out great, once the concrete has cured it will all dry consistently white like all concrete.

04.01.2022 Job we are currently completing in Strathalbyn, with earthworks, some stormwater and concrete with a slated fence and gate to follow.

04.01.2022 Shed season at the moment, this one was in Kanmantoo for a repeat client Jess, 65 sqm shed and apron.

03.01.2022 Second last pass on a shed we built and poured at Walker Flat, was a late night but it turned out

02.01.2022 Driveway and perimeter paths we completed in Mt Barker with Boral galaxy exposed mix, we also completed the earthworks.

01.01.2022 We poured 5 x 7m feed pads for the zoo animals out at Monarto last week in the new section of the park

Related searches