Dme Engineering | Other
Dme Engineering
Reviews
Click/Tap
to load big map
to load big map
25.01.2022 Installation of mixing pump and homodgeniser piping.
24.01.2022 Manufacture of some post tension anchor boxes for one of our clients.
24.01.2022 Some fabrication pics
21.01.2022 Mezzanine floor installation
15.01.2022 Steam pipespool replacement.
11.01.2022 Looking for boilermakers, welders and mechanical fitters for our new projects based in western Sydney. Please send resumes to, [email protected] Or alternatively message us.... Regards, Alan.
11.01.2022 Manufacturing complete. a chilled water tank for one of our clients.
11.01.2022 Chilled water tank on its way out.
10.01.2022 Mezzanine floor manufacture
02.01.2022 Manufacture of a modular truss pipe bridge for one of our next projects.