23.01.2022 Footpath poured and finished at United servo



23.01.2022 Verandah poured and finished and crossing set up ready

22.01.2022 BallaratPrep of swimming pool with geo mat- in all my 25 years doing pools - never have I seen this - also there were 2nd and 3rd generation pool builders there on the day and they never saw this before- job came up good

22.01.2022 Nagambie hospital - extension, poured and finished



22.01.2022 Starting of the spray

22.01.2022 Stencil- concrete-dugout, meshed,poured and finished-

22.01.2022 Slab nearing the end



21.01.2022 Hard stand poured and finished and all faced

21.01.2022 Set up paths in back yard- black/charcoal poured and finished

20.01.2022 Couple of slabs in Kerang

20.01.2022 Riverside pebble pergola area

20.01.2022 Office extension



19.01.2022 Mori Concrete contractors are proud to be part of this subdivision

19.01.2022 Lay back crossing in Seymour

19.01.2022 Truck wash - falling into pit

17.01.2022 Job in Dookie peeped and poured- and saw cut

17.01.2022 Path to footpath- poured and finished

16.01.2022 Top of 3rd floor toorak - what a view- setting up pour

16.01.2022 Sea lake -6.55am

15.01.2022 Kerb-at Pieface in KIALLA

15.01.2022 Sealake- lookout point- surrounds prepped, poured and finished all week

15.01.2022 7am -on the job

15.01.2022 Pour in Katunga- 2 day

14.01.2022 BENDIGO- horse pool for their training- big day - 80 metres of concrete-just got the last truck - just on dusk-massive 14 hr day

13.01.2022 Set up - black concrete- poured and finished- KIALLA servo

12.01.2022 Pad done - water running to pit

12.01.2022 The Caltex sign being craned to its new home possion

12.01.2022 Running the Fresno

12.01.2022 Layback kerb / boxed , poured and finished

11.01.2022 Swanhill- retaining walls- top deck poured 1st day- bottom deck poured the next- gonna look good when all landscaped.

11.01.2022 hillside- pool - poured and finished- lots of steps and there will be a water feature with rocks

11.01.2022 Rendering of straw house- second coat-inside walls as well - notice the rock wall inside the house- (fantastic)- stay tuned for final coat in a months time - after the windows go in

11.01.2022 Ramp at sea lake

10.01.2022 Pergola pad in Barmah-set up , poured and finished

09.01.2022 Ramp in Shepparton- set up poured and finished-Kieth was rapted- even had time to try his Harley Davidson out

07.01.2022 Pad -poured and finished

06.01.2022 Driveway line pumped 95 metres in mytreford Vic- owner is so happy

06.01.2022 Setting up pump - in the early hours

05.01.2022 Got paid for a job the other day-the best

05.01.2022 Poured the floor of Carls jr burgers in KIALLA

05.01.2022 Car wash bay in KIALLA

04.01.2022 Some video on Bendigo horse pool

04.01.2022 Stencil - nice color , great patern

03.01.2022 Little jimmy working hard

03.01.2022 3rd storey - con deck pour in east Malvern of 6 mega apartments- to be continued-with front pad of luxury penthouse to be constructed soon

02.01.2022 Front path and ramp- the new United servo- Melbourne rd

02.01.2022 Vehicle crossing poured in shepp east

02.01.2022 Path around house- back pergola and carport in Batmantum

01.01.2022 Shed poured and finished

01.01.2022 Engine room of a Carwash