25.01.2022 NAM starts little project in Brunswick East Works consisted of excavation retaining wall structures drainage and a complete re-landscape three days executed here so far all walls and drainage are complete. keep posted for the final product andeverybody have a safe Queen’s Birthday long weekend.



24.01.2022 Car garage height modifications to make way for new car Hoist. Big thanks to Chris barker for the brick work. Manny & Samuel Ellul for the roof and plumbing and Luigi for the rendering! Thanks Nigel & Lisa for being awesome clients

23.01.2022 New digital print accountants office complete

23.01.2022 NAM delivers 125 year old recycled ironbark jetty on the Yarra River for a high-profile family this project was executed within seven days all new pylons lowered into 1.2 m of water and Then Pile driven 4 m into the silt



23.01.2022 NAM’s first five Coffee table precast Lids are ready for a water polish. going out to a high-profile customer and before they leave the factory they will be placed on 150-year-old Spotted gum timber frame from Princess Pier including a remote control LED light system.

21.01.2022 NAM wins concrete apron repair works at Orora Brooklyn site. What we do is deliver on safety, capability and quality insurance. That’s what makes us National Australia maintenance !

19.01.2022 Little Bubba playing in the sandpit for the next few weeks to make way for waste material off the Westgate bridge painting project executed by McElligotts. hope he’s well-behaved boys



16.01.2022 NAM secures Opal as its new client

16.01.2022 Two semis packed with 2000 Bluestones heading up to one of live projects in Northern Victoria Keep an eye out to see what we create with these magnificent stones..

15.01.2022 NAM pumps out 500 lineal metres isolation joint caulking in one day

14.01.2022 Emergency call out this morning in Lonsdale Street very delicate coring over high-voltage power to locate damage asset. This can be a very dangerous procedure when we have to keep The power supply running.

12.01.2022 Quick site clean and prep the area for site sheds to come in from one side of the project to another..



11.01.2022 Flinders Street viaduct project

09.01.2022 Hugo Dangerfield gives us a quick rundown on 52 Fenda bollards which were realigned tensioned and re-painted without any interruption to the public or marine life.

03.01.2022 New digital prints accounts office coming along very well. The works that have been done on this project so far has been a weeks turnaround From subfloor demolition work framing electrical data to the plaster being completely hung and stopped up and ready for painting with no interruption to production.

02.01.2022 Emergency call out in Melbourne CBD works carried out Subgrade Bluestone supply and lay after a major pipe rupture at an entrance of a 50 story residential building with no interruption to vehicles or The public. Just another way NAM is keeping public area safe.