Australia Free Web Directory

Tenze Engineering in Punchbowl, New South Wales | Automotive repair centre



Click/Tap
to load big map

Tenze Engineering

Locality: Punchbowl, New South Wales

Phone: +61 2 9758 2677



Address: 55 Christian Rd 2196 Punchbowl, NSW, Australia

Website: http://www.tenzeengineering.com.au

Likes: 33

Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 This is a nice little roof extension we did at Potts point that over looks garden island to the east!! It would. E a great place to be on New Year's Eve!



21.01.2022 This is a few photos of the new tiger enclosure at Taronga Zoo we are currently working on. We have seven buildings to fabricate and install totalling 55ton. The photos are of the first two buildings Middle point complete and C4 just starting to be erected. With a cheeky look from one of the locals

20.01.2022 This an awning we did at the Reding shopping centre at Auburn. It was not an easy job as all the beam were fabricated T bars. The job was then galvanised which meant all the beams had to come back to the Wshop and be straightened. Now you can grab a burger and stay out of the weather

20.01.2022 Here's a few photos of the awning were doing out at Barangaroo, there's still a bit of work to go yet.



19.01.2022 This is a job we did a couple of years ago December 2014, stairs running through three floors, 1st to 4th. this was not an easy job as all the steel had to be winched from the ground floor through the 1st floof all the way to the 4th. The balustrade on the stair had 5mm Stainless steel wire with turn buckles every second starde and they all lined up!!

18.01.2022 Here is a condensor deck that Tenze manufactured and installed for the coles at the Kirawee mall, it was a total of 13ton with 180m2 of grating. All up in 4 days

17.01.2022 Tenze Engineering was lucky enough to provide the structural steel to the mall roof at the Kirawee brick pits. The roof was a total of 80ton including the purlins. The steel left the wshop on 5 semi trailors. It took us a week to set out and chemset the hold down bolts all 350 of them and 3 weeks to install the structural steel and the purlins. The mall will be open this year ready for your christmas shopping!!



16.01.2022 Tenze has been busy leading up to the Christmas break. This is a little 10 ton job we put up on Friday at Strathfield. This was a burnt out building that had the roof removed and being replaced. We had to site measure every existing bolt hole so the new steel would match perfectly, we managed to get all the rafters and bracing up on one day. The crane will return on Monday to install the racking angles. Well done men!

15.01.2022 Here's some photos of the new tiger dens we fabricated and erected at Taronga Zoo Sydney. Very soon the tigers will be back to play in their new home.

15.01.2022 Erskineville again we fabricated an arbour form a 300UC, with Stainless steel wires to run from the ground up to the steel so that plants can grow up them. This time we used Reach crane to install the steel as the beams were 8m long and weighed 800kg. Great work!

14.01.2022 This is the 26ton we manufactured and installed down at the Kirawee Brick pits. All steel up in 3 days

14.01.2022 We even managed to get it around the local traffic without touching it.



13.01.2022 Here is a job we're doing at Darlinghurst, we have two floors and a roof to go totalling 18ton of steel. The men are currently installing 12 columns that are needed to stabilise the existing building. Due to the limited space we're using Tenze Engineering's 4.5ton maeda crane. Great work men!!!

13.01.2022 Over at Tenze we have been busy leading up to the Christmas break. We did a 28ton roof top all made from 250x150RHS. the roof is an equilateral triangle, one side measuring 28.8m. The roof is made up of 144 smaller equilateral triangles all bolted together. Fabrication had to be 100% correct on this job for 2 reasons, 1st so it all bolted together perfectly as it usually does, 2nd because the glass was ordered from our shop drawings as the build time did not allow for a site ...measure then order. To erect this job we had to get a 90ton crane to pick up our small Maeda crane and lift to the 5th floor and erect the job with the Maeda. A lot of coordination went on as we could only deliver on Saturdays due to council permits, so we had to deliver only what we could put up during the week and only what we could fit on the roof being careful not to overload the concrete floor. The job went up well and everyone was happy! Especially the glazing contractor. See more

13.01.2022 These are the legs off to the painter, to a new service station canopy going up out at Cranebrook at the end of March

13.01.2022 This is a 3.8m beam that weighs 420kg that went in a KingsCross station. We had to splice the beam so we were able to take it down in the lift. It's to heavy to carry down the stairs! Great work men!

11.01.2022 We have been busy at Tenze, we knocked up this 22m pedestrian bridge.

11.01.2022 Here's 2 sets of fire stairs on the truck ready to head off to the galvos tomorrow. The guys will be on the job on Monday to start erecting the building then move onto these stairs!

11.01.2022 We have the trailer loaded and cant put the job as there is a little bit of water on the job. 1.5m apparently

11.01.2022 We're out at Mt Druitt today installing the new Fire station. It's a nice easy 9ton job that went up in one day, great work men!

09.01.2022 Another fabricated job going to a customer thats will be assembling the skid and sending to a mine in Queensland

08.01.2022 Another fabricated job going to a customer that’s will be assembling the skid and sending to a mine in Queensland

08.01.2022 This is job we completed at Port Hacking yesterday. Structural framing to support the roof to the owners new Tv room. What a view! All the steel had to be passed down through the back of the garage and erected by hand. Great work!

07.01.2022 We did the structural steel support for the awnings at Birkenstock’s head shopping centre, all steel painted with a 3 coat system to protect it from the elements.

07.01.2022 Tenze has been busy down at the Kirawee brick pits, We installed a 2.5ton 5.3m long and 1.8m high truss yesterday! Great work guys!

07.01.2022 We had fun on the weekend in the 40deg heat putting this little roof top up out at the Kensington uni. Fortunately we were able to finish up with the crane early so we were out of there by 1pm and mist the brunt of the heat!!

07.01.2022 Tenze has been busy in the factory! we sent out 26 ton of steel on Friday

07.01.2022 We did the structural steel support for the awnings at Birkenstocks head shopping centre, all steel painted with a 3 coat system to protect it from the elements.

07.01.2022 This building is an 18ton Hall that we fabricated and installed for a school at Kemps Creek.

07.01.2022 This great property at Mossman we had the privilege of knocking up 43m of fence and the 2 front gates. All made from aluminium and powder coated.

06.01.2022 We had a long wet day down at Shoalhaven hospital installing their new operating room. 5 ton erected using An 80 ton crane pushed to its limit with the fly and needle to get the reach. Great work men!!

06.01.2022 Stairs down in the loading dock at Kirawee

05.01.2022 Some of the Fabrication and finished product for the project we were on at Bellavista. 100ton of steel plus 500m2 of grating and 300m of mono wills handrail

05.01.2022 This was huge spiral staircase with an outside diameter of 2400mm with a Stainless steel hand rail with perforated mesh. This was lifted to the 3rd floor and fit into position with a Hiab Truck off Foveaux St in Surry Hills. We had to be extremely careful not to damage the tiles and glass that were already in position. Now the students at the music school can use the stairs and not the lift!

05.01.2022 This is fabricated channel weighing 908kg. Tenze installed it at a job site in Hurstville to support the slab so the builder can remove the wall to gain access to the new building.

02.01.2022 Tenze has been working out at Erskineville putting up 57ton of steel to help build 18 new 2 level apartments. The job was done in three stages consisting of 6 apartments each. We had to work in closely with the chippies through the drafting stage and on site so that their timber frame could fit neatly in between the steel. Once again we were using our Maeda crane to install the structural steel. Well done Men!

01.01.2022 You may remember the gate and fence we did for a client back in February 2017, well a delivery driver decided to back into the gate. Tenze was called again to remake and replace the gate, great work men

Related searches