25.01.2022 Construction of a 6 metre wide road on a surveyed road started with installation of concrete pipes through a steep gully on a creek line. Once the crossing was in, access was gained to start the cut and fill of the road. Batters were cut and topsoiled and pipes were installed for drainage. A short stop for a few days of heavy rain and we were onto carting rubble. The road is not yet finished but very close only needing a final trim and roll and it’s done.



22.01.2022 A new driveway with drainage and topsoiled batters. Looking forward to seeing this in a few months once the grass takes on the batters.

20.01.2022 The latest piece of equipment to add to the collection. The new grader

19.01.2022 Spreading of topsoil ready for lawn. The finishing touch to a new house.



16.01.2022 3.6m Split level house cut with tiers ready for retaining walls and removal of over 1500 tonnes of soil. Was a big job to see what the excavator could handle

10.01.2022 Flagstaff primary school rain garden almost complete. Pool fencing next week by Scott from Fleurieu Fencing Solutions and planting of native plants by the kids of the school soon.

07.01.2022 Removal of old concrete and slate driveway and preparation for new concrete.



05.01.2022 Flagstaff hill R-7 school stormwater catchment and sand filter system. Still in progress but well on its way. This 'rain garden will be planted with native plants as a carbon filter before the water heads down stream.

02.01.2022 Repairs to a dam wall damaged by 2016's massive rains. The farm's major water source ready for the next rains

02.01.2022 The job before the Christmas break was a 500m extension to the 6m wide road we constructed earlier this year then a large 2.8m deep site cut for a shed. We shifted approx 4000 tonne of fill cut from the shed site to help fill the road to make the access for heavy vehicles easier on the steep slopes. Next stage it carting in over 1200 tonne of rubble early next year.