Australia Free Web Directory

Vector Lifting | Engineering service



Click/Tap
to load big map

Vector Lifting

Phone: (08) 94179128



Reviews

Add review



Tags

Click/Tap
to load big map

23.01.2022 Always nice when a client sends you a photo of a recent installation @Snowy Hydro NSW



22.01.2022 2 x 50 Tonne x 30m Box Girders, client required manufacture to be completed within 6 weeks. Great job by all our team. #Vectorlifting, #MadeinWA

21.01.2022 AusRail Expo - Sydney convention centre stand 334. @ausrail

20.01.2022 Some exciting projects coming up, it's always great to have a full workshop. Martin Tognala



17.01.2022 Some recent projects to leave our factory

17.01.2022 Another Jib crane installation completed. 750kg x 5m Reach

12.01.2022 Proud to be a part of this project.



11.01.2022 A new gantry crane now sits atop the iconic Kununurra Diversion Dam, thanks to a $4.1 million State Government project to upgrade the essential piece of irrigat...ion infrastructure. Standing seven metres tall, the 65 tonne steel crane is the only gantry crane in Western Australia that operates over a roadway. The new crane will ensure the ongoing operation of the Kununurra Diversion Dam, which diverts and regulates the flow of water from the Ord River into the Ord Irrigation Area. It works by travelling along the diversion dam wall lifting the 20 tonne blocks that sit on top of the dam's 20 radial gates that form the roadway, allowing important maintenance to be carried out. The new crane utilises the latest technology to make it safer and easier to operate, and is expected to ensure the smooth operation of the diversion dam for the next 60 to 80 years. The original 54 tonne gantry crane was installed 56 years ago in 1963 as part of a project to build the Kununurra Diversion Dam and contain the flow of water from Lake Argyle. After more than 50 years in operation and nearing the end of its lifespan, it has been relocated to the corner of Victoria Highway and Millington Drive near the Kununurra Diversion Dam. Western Australian expertise was used to design, build and install the crane, employing 12 people throughout the duration of the project as well as three local subcontractors. Perth-based business Vector Lifting manufactured the new gantry crane and several local Kununurra subcontractors helped install the large piece of machinery. See more

10.01.2022 Completed conveyor take up winch. Martin Tognala

06.01.2022 One down 3 to go.

05.01.2022 Vector Lifting recently completed the installation, testing and commissioning on the Margaret Court Arena Retractable Roof in Melbourne Victoria which forms part of the tennis centre. Vector Lifting was contracted to completed the design, manufacture, installation and commissioning of the mechanical components, drive and control system for the retractable roof. The link attached shows a short video from national news showing the retractable roof in action, the project has been hailed a success. This is Vector Lifting second retractable roof built and installed in Australia after the completion of the Perth Arena in 2012.

02.01.2022 Vector Lifting will be attending the Ausrail Expo in Melbourne between the 24th-26th of November at the Melbourne Convention Centre. Stand 303.



Related searches