Australia Free Web Directory

VSC Building Group Pty Ltd | Contractor



Click/Tap
to load big map

VSC Building Group Pty Ltd

Phone: 9303 8979



Reviews

Add review

Click/Tap
to load big map

25.01.2022 A bond-Deck tray slab prepared at the childcare centre in Croydon for the first floor. A composite slab construction i. e. Steel supporting structure with a flat suspended slab plate sitting atop etc. was adopted to increase the clearance height between the finish floor level of the ground floor car park and to keep within the overall permissible height limit of the building. This is because the overall member depths between each construction system can be reduced. To a builder that is restrained by height requirements, this solution is one of the many options that can be sought.



24.01.2022 Bluestone coloured stairs, landing with ramps and a main concourse slab in a courtyard of this very aged and beautiful school administration building for a Catholic School in Hawthorn.

20.01.2022 Finishing of a ramp slab on ground in Wheelers Hill for an apartment complex.

19.01.2022 Construction of a conventional suspended slab including AFS walls for the ground floor to an apartment building complex in Brunswick.



08.01.2022 Bulk excavation and base slab for the staff room poured, insitu footing walls to the staff room built and abutting dining room raft slab to the staff room recently completed. Next will be the infill slab preparation to the production floor. Construction of a wine production facility.

02.01.2022 A post tensioned suspended slab pour for one of our recent projects at the Craigieburn Medical Centre. Post tensioned slabs capitalise on the tensile advantages in reinforcing steel by tensioning reinforcing steel tendons after the slab has been poured. This construction methodology can improve on building time and cost due to the benefits that post tensioning provides i.e less materials, simpler structural designs as members can be spread out further and decreased duration etc.

Related searches