Enacon Group Pty Ltd Powerline Construction

Phone: +61 400 757 349



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Huge thank you to Custom Earthworx for their help to install a new substation at Orange today. This project wouldn’t have happened without Brendan’s experience and dedication. Thank you!



23.01.2022 The team from Enacon Group have completed construction of a new 100kVA transformer and powerline relocation. The new substation pole was installed in the Megalong Valley to allow construction of a new house. Well done guys.

21.01.2022 Great work by Sean and his team to get a factory in Lithgow up and going again 30hrs after a major electrical fault. Sean installed a temporary 400amp switchboard and 3 generators to get the factory back online. The factory produces critical supplies for the NSW Government. Great effort guys.

20.01.2022 Big thank you to the team today for working at Oberon in terrible conditions to install a 25kVA three phase substation. The customer was extremely happy that the guys worked through the rain to allow their new house to be powered up and turn the lights on. Well done guys.



18.01.2022 Enacon Group has spent the first day completing the electrical maintenance on the High Voltage system at a wind farm in the Central West. Matt’s team completed insulator replacement and general defects to reduce future fire risks.

18.01.2022 The team from Enacon Group have completed the Level 1 ASP construction of a 200kVA pole mounted transformer and powerline extension. The guys installed the transformer for the new BRC flood pumps and levee bank at Perthville. Well done guys.

18.01.2022 Sean and Matt’s team from Enacon Group completed the Level 1 ASP construction for the install of a 500kVA pole mounted transformer today. The team installed the substation and LV underground network for a new commercial development in Bathurst. Thanks to the guys for completing the project ahead of time for the client. Well done guys.



15.01.2022 The team has reloaded and we are ready to build!!!

13.01.2022 The team from Enacon Group have completed construction for a 500kVA transformer upgrade for the new Taco Bell in Orange. The substation upgrade allowed for the 200amp Level 2 connection. Thank you to Essential Powerline Design for completing the Level 3 Design. Give Enacon Group a call for all your power upgrade requirements in Orange. Enacon Group has the experience and qualified team to deliver your projects on time and too budget.

12.01.2022 Enacon Group has recently completed the powerline relocation for the new roundabout being installed at Mitre Street Bathurst. Thanks to the boys for a huge day to install 2 new power poles, 5 streetlights and upgrade the low voltage powerlines to supply the local area.

12.01.2022 The team from Enacon Group have been awarded the contract for the Level 1 ASP construction and Level 3 Design work for a major power upgrade at the Dudley Private Hospital Orange. The guys started construction for the install of a new 1500kVA substation this week.

11.01.2022 The team from Enacon Group has completed the Level 1 construction work to relocate a power pole for the RMS near Bathurst. The powerline and pole was relocated to allow for the widening of the Great Western Highway and for the install of safety barriers. This relocation was the first stage to remove traffic ‘black spot’ in the Central West.



10.01.2022 WE ARE HIRING Custom earthworx Is a small earthworx/civil company based in the central west. We are looking for a plant operator to join us. To be considered u... must have experience in operating excavators Positrac bobcats backhoes & rigid trucks. Our work revolves around the residential Commercial Utility Rail Industries with plenty of OT available. You must be Self motivated Problem solve Take pride in your work Mix with various contractors Pass drug & alcohol testing & treat machinery with respect Training will be provided & licensing will be subsidised if required If you think this may suit u please contact Brendan on 0417250666 or send ur application to [email protected] Please note more than 1 operator may be considered Junior applicants will be considered Subcontractors will be also considered See more

08.01.2022 Enacon Group’s Level 1 ASP team have completed construction of a 50kVA transformer for a new Optus Mobile Tower at Oberon. The guys have the experience needed to complete all your power upgrade requirements.

08.01.2022 Enacon Group have recently completed the high maintenance for GPM at the Wallerawang Power Station site. Enacon Group can provide maintenance and construction solutions for all private high voltage customers.

07.01.2022 Enacon Group has recently completed a transformer upgrade in Canowindra. The three phase upgrade supplies power to a new pump. As part of the project the existing powerline was relocated to enable increased productivity for the pivot irrigator. Please get in contact with Andrew for a on site visit to discuss your options. Andrew 0400757349.

06.01.2022 Enacon Group have completed the Level 1 ASP construction of a 200kVA pole mounted transformer today. The team completed the substation and Level 2 install for a new petrol station at Oberon. Thanks to the guys for working on Sunday to minimise the impact on surrounding businesses. Well done guys.

01.01.2022 Enacon Group have recently completed the Level 1 construction of a 16kVA pole mounted transformer near Bathurst. The team also installed the Level 2 underground mains and smart metering for the new house. Well done guys!