Australia Free Web Directory

Southern Plumbing Projects in Cronulla, New South Wales, Australia | Home improvement



Click/Tap
to load big map

Southern Plumbing Projects

Locality: Cronulla, New South Wales, Australia

Phone: +61 449 221 675



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Decommissioning of a Langco copper gravity fed hot water system in this 1940’s house today. Still working after approx. 70 years but being upgraded to a mains pressure unit to deliver better pressure to the house and head off any leaks that may happen in future. @ Sydney, Australia



24.01.2022 Before and After of a solar changeover. Original setup was removed for some roof restoration work and a new @rheem 300L tank and panels went back up. @ Bundeena, New South Wales, Australia

23.01.2022 Tom going full reach on a sewer main in the little 1.7

23.01.2022 Triple mixer set out from our recent Redfern townhouse renovation. Tapware by @abiinteriors



22.01.2022 Rheem Commpak hot water manifold installed to supply continuous hot water to a new unit complex in Maroubra.

21.01.2022 Before and after Upgraded amenities in a new office space for a Surry Hills law firm @ Surry Hills, Sydney

20.01.2022 With water quality diminishing in Sydney of late, a lot of people are opting for filtered water. This is a 5 stage Reverse Osmosis filter system we installed recently to improve the clients drinking water. We installed a filtered tap in the sink for filtered tap water and also connected the system to their fridge for chilled water. Reverse osmosis is a water purification process that uses a partially permeable membrane to remove ions, unwanted molecules and larger particles ...from drinking water such as lead. Also included in this setup is an Alkalising filter because studies have shown that when our bodies are more alkaline and less acidic, they are more resistant to chronic illness, diseases and ageing. Drinking alkaline water will assist in reducing harmful toxins in your body and improving your general health and wellbeing. Pre-Filter #1 Polypropylene filter removes larger particles such as dirt, rust & sediment. Pre-Filter #2 10 Micron Carbon Block removes chlorine and chemical contaminants in the feed water and protects the RO membrane. Reverse Osmosis Membrane Thin Film Composite Membranes reduces dissolved minerals, metals, and salts. In this process, harmful compounds are separated by the membrane from the water, and the contaminants are flushed to the drain via the black tube. Post-Filter A coconut shell activated carbon post filter is provided for a final "polish" and to remove tastes, odors and to provide great tasting water. Bladder Tank Because of the slow filtering process, the bladder tank holds 8 litres of purified water, ready to use.



18.01.2022 Thanks to Sophie B Photography - Weddings, Events, Corporate for coming out to Bundeena to snap a few photos completely free of charge to help promote our business. Check out her page for any photography work you may need and Sutherland Shire - Open 4 Business for all the work she’s doing with businesses working through COVID-19.

17.01.2022 Merry Christmas to all of our clients, suppliers and fellow tradies. We will be back in full swing on the 11th of January but until then we will still be available for emergency calls 24/7. Hopefully everyone gets a well deserved break and we look forward to getting stuck back into it in the new year. ... Rhys and Tom 0449 221 675 / 0420 618 949

14.01.2022 The water jet has been getting a workout lately. Blocked drains galore

13.01.2022 Split solar replaced and relocated up to a nice dry location and out of the damp jungle it was living in. Pipework renewed and cleaned up. #thermannthursday @ Sylvania, New South Wales, Australia

11.01.2022 Double bathroom renovation starting today in Woronora



11.01.2022 Endless hot showers ahead from this Rinnai Infinity 26 we installed in Corrimal.

10.01.2022 What it looks like when a reflux valve fails and 14 stories worth of sewerage finds its way out on the ground floor

10.01.2022 Make the most of the downtime to take care of some essential repairs. Two new Zenox pumps being installed at @mirandahotel to make sure they are up and running in time for beer o’clock, whenever that may be.

09.01.2022 Blocked drains with a sunset

07.01.2022 Not a PB but still a decent catch. Removing a root system from a blocked stormwater line.

04.01.2022 CCTV is a great way to find out the condition of your underground sewer and what is causing blockages. From this we are able to determine the location of the issue and the best solution for repairs.

03.01.2022 Today’s labourer

02.01.2022 22,500L poly rainwater tank being installed. Now we just have to pray for rain

02.01.2022 Renovations for @mirandahotel to expand their sports bar.

Related searches