Australia Free Web Directory

All Stripped Brisbane | Local service



Click/Tap
to load big map

All Stripped Brisbane

Phone: +61 7 3337 9993



Reviews

Add review

Click/Tap
to load big map

25.01.2022 Day 3 of 390m2 of tiles and bedding in an apartment block in Kangaroo Point. All the tiles are up, just filling up the bins and grinding to go. Should look pretty good by the end of tomorrow.



25.01.2022 Here are the pictures of the timber floor the boys pulled up, removed nails and ground adhesive off timber sub-floor. #timberremoval #timberflooring #floorgrind

25.01.2022 Its been a busy couple of weeks for the boys, heres the end of 315m2 of terracotta tiles from around the outside and pool area of a property in Birkdale. Now its time for the tilers to do their thing. #tileremoval #dustfree #renovations... #diamondgrind See more

24.01.2022 1 bathroom & 2 powder rooms All Stripped back to bare stud and concrete slab. Plumbers have moved in and the putting it all back together stage has begun. #bathroomrenovation #tileremoval #floorgrinding



23.01.2022 One final big job done for 2018. The boys have just finished stripping out an entire house upstairs and down in preparation for the top level to be lifted and a full makeover to begin. We have a couple of little jobs to close out the year but we will be back into early in 2019. Until the Merry Xmas and Happy New Year to you all. #renovations

22.01.2022 Another pool completed. 146m2 of pebblecrete this time and only took a couple days. All uplifted, removed and ground ready for pebblecrete to go back on. #Poolrenovations #floorgrinding

22.01.2022 After a week and 2 days all 250m2 of wall tiles have been removed. A 1.5m perimeter around the edge equating to about 225m2 has been uplifted from the pool floor. No we tackle the remaining 1000m2. #poolrenovations



21.01.2022 And that’s a wrap. No blood, no tears but plenty of sweat in this one. There were fist pumps and high 5’s when the final piece of flooring came up on Saturday. After a couple of days grinding and cleanup yesterday we were official done. Now the tilers and waterproofs are doing there thing and the pool should be operational again in a couple of weeks. Massive effort from everyone involved. #poolrenovations #tileremoval #floorgrinding

20.01.2022 And thats a wrap. 1 pool, 9 units an extra bathroom and 2 lots of stairs later and were finished well ahead of schedule. Time to get back to the Mainland and remove some more tiles. These boys know how to work and get it done, love working with the maintenance crew out here too. See you again in July for some more Unit stripouts. #tileremoval #renovations #concretegrinding #poolrenovations

20.01.2022 And just like that 80m2 of tiles are gone and the floor ready for a further grind and epoxy paint finish. Then it will become a tattoo parlour. Not all jobs are this easy but when they happen on a Friday its a bonus. Enjoy your weekend. #tileremoval #dustfreetileremoval #floorgrinding... #renovations See more

20.01.2022 After the Q1 job was out of the way the guys headed up to Mt Tamborine to remove 167m2 of slate tiles around a house. Here are the before and after photos. The clients were so happy with the work they decided to get our guys to stripout their bathrooms and also remove some concrete paths as well. #slatetiles #tileremoval #floorgrinding

20.01.2022 Heres some before and after photos of some smaller jobs the boys also completed this week. #tileremoval #floorgrind #concretepolish



19.01.2022 Midweek the boys Stripped out a shop in Browns Plains and took it back to a shell ready for new customers to move in. #shopdefit #renovations #shoprefitting

18.01.2022 It was a nice big job to start the week. 150m2 of tiles pulled up over 2 days. Rubbish all taken away and concrete slab ground back ready for tiles to go back down. The customer and her husband have had a few health issues recently and they were drawn to our dust free service and were not left disappointed. They were pleased to get back into the house and breath easy. #dustfreetileremoval #tileremoval #homerenovations... #floorgrind See more

18.01.2022 Shes a big job but shes done. 321m2 of tiles & bedding off 9 balconies, downstairs patio and a pool area. Not to mention removing planter boxes and a mailbox for good measure. All ready for stage 2 of a multi million dollar rebuild. #tileremoval #renovations #floorgrinding

18.01.2022 BIG JOB ALERT. 220m2 of tiles & bedding as well as the inside lining of a pool & spa. Everything uplifted, removed and ground ready for the next stage. Massive effort and undertaking. No job to big or small for All Stripped. #tileremoval #poolrenovations #floorgrinding

18.01.2022 She’s a big job we are starting today. 1500m2. Will check back in in a few days to update on the progress. #poolrenovations #tileremoval #floorgrinding

17.01.2022 Good way to work off the Xmas and Boxing Day lunches. An easy 73m2 of tiles uplifted and floor prepped ready for tiles to be re-laid. All done by lunchtime.

16.01.2022 Short week last week but we managed to fit in 140m2 of tiles in Ormiston as well as 50m2 in Sinnamon Park, 40m2 in Southport and a Bathroom/Toilet Renovation. #tileremoval #dustfreetileremoval #poolrenovations... #bathroomrenovations #floorgrinding See more

16.01.2022 Off to Tangalooma again for a couple of weeks work. We are stripping out 9 units and a swimming pool. Keep an eye out for the finished results.

15.01.2022 Its not often we get to do this, however yesterday we were back at Mermaid Beach to start the full stripout of a penthouse apartment. We had previously been there to remove all the exterior paths, pool area and balconies. These have since been redone so I can show you the before, during and after if a job. #tileremoval #renovations #tiling

15.01.2022 Last week we launched our new booking system and one of the great features is instant onsite photos. This will allow us to show you more regularly what our crews do each and every day. Here is a small job the guys completed around a pool in Chapel Hill on Tuesday. The homeowner was extremely happy with the finished result and the tiler was in the next day to relay new slip free tiles. #tileremoval #poolrenovations #floorgrinidng

15.01.2022 Here are before and after photos of the bathroom strip of floor tiles and walls as well as the before and after photos of the concrete path removal at Mt Tamborine. #bathroomrenovations #concreteremoval #tileremoval

15.01.2022 Just a casual 118m2 of tiles on tiles to start the week. Super Easy, barely an inconvenience. Bring on the rest of the week. 410m2 of rooftop waterproofing tomorrow. #tileremoval #floortiles #floorgrinding

13.01.2022 88m2 of tiles & 8m2 of tiles and bedding all done in a day. No sweat in this heat. #tileremoval #floorgrind #dustfreetileremoval

13.01.2022 Before & After photos from a complete apartment stripout in Hamilton to start the week. We removed 40m2 of tiles, 80m2 of carpet from the floors as well as removing the kitchen, laundry, bathroom and en-suite. #renovations #tileremoval #carpetremoval #kitchenrenovation #bathroomrenovation

12.01.2022 We removed 68m2 of tiles and 29m2 of carpet from this property in Wellington Point. All done in a day ready for tiles to be relaid. The kitchen had electricity conduits running along the front of the cabinets so we had to be extra careful but it was no problem for our experienced team. #tileremoval #carpetremoval #renovations

11.01.2022 Two small jobs out of the way to start the week. 30m2 of floor tiles removed in Narangba in the morning and 23m2 of tiles removed from a patio in Caboolture in the afternoon. All tiles uplifted dust free, rubbish removed and floor ground in preparation for tiles to be relaid. #tileremoval #dustfreetileremoval #floorgrinding

11.01.2022 Over the last few months we have done over 3000m2 of grinding on balconies across the Gold Coast. Its been slow going at times but the views have been incredible. #floorgrinding

10.01.2022 Last week we finished off the week with 114m2 of tiles & bedding around a pool area in the city. Halfway through we encountered and extra layer of bedding and chicken wire under the waterproofing. Just one of those hidden challenges you run into from time to time. We got it all done on schedule though but unfortunately the rain arrived just as we were packing up so we couldnt get some after photos but the site boss sent us some on the Monday once the waterproofers had put th...eir first layer on. #tileremoval #dustfreetileremoval #poolrenovation #concretegrind

10.01.2022 Another pool patio renovation completed and ready for new tiles to be laid. This one was was 108m2 completed over a couple of hot days. #tileremoval #floorgrinding #poolrenovations

10.01.2022 Day 2 is underway. Good day yesterday.

08.01.2022 Shes a big job we are starting today. 1500m2. Will check back in in a few days to update on the progress. #poolrenovations #tileremoval #floorgrinding

08.01.2022 And thats a wrap. No blood, no tears but plenty of sweat in this one. There were fist pumps and high 5s when the final piece of flooring came up on Saturday. After a couple of days grinding and cleanup yesterday we were official done. Now the tilers and waterproofs are doing there thing and the pool should be operational again in a couple of weeks. Massive effort from everyone involved. #poolrenovations #tileremoval #floorgrinding

07.01.2022 2 nights, 2 shops completely stripped ready for a brand new refit. A great end to the week. #shopdefit #shoprefit #renovations

06.01.2022 The perks of rooftop waterproofing removal is the views. The Gold Coast is looking good from this height. We’re about halfway through the 410m2. We have to love it and leave it tomorrow though (we’ll leave a couple of boys behind) as we’ve got 105m2 in Banyo to do for another regular builder. #waterproofing #floorgrinding #goldcoast

06.01.2022 Our crews were on both Coasts to finish off last week. 50m2 of tiles in a house on the Sunshine Coast removed in preparation for new tiles to be relaid and 40m2 of tiles and waterproofing off 2 balconies on the Gold Coast all ready for new waterproofing to be applied and tiles laid. #tileremoval #floorgrinding #renovating #renovations #dustfreetileremoval

05.01.2022 We finished off a short week last week by knocking over 191.5m2 of tiles in a day and a half. The big tiles and thick glue were no match for our power tools. #tileremoval #floorgrinding #renovations

04.01.2022 Its been a big week for the boys. Here is before and after photos of 80m2 of tiles on bedding which was 80mm thick in an apartment in the Q1 in Surfers Paradise. Took the crew 2 days and a lot of elevator rides to get it all up and ground back ready for tiles to be re-laid. #tileremoval #floorgrinding

04.01.2022 Finished the 390m2 of tiles & bedding in Kangaroo Point yesterday. Now straight into 270m2 & a pool on the Gold Coast. Can’t slow us down.

04.01.2022 Before and after photos of 100m2 of tiles removed from the back patio for one of our regular tilers. Nice easy start to the week. #dustfreetileremoval #tileremoval #floorgrinding... #renovations See more

03.01.2022 We are now back in the swing of things. So far this week weve done tile removal, timber removal as well as a whole house strip and its only Wednesday. Heres some pictures of what weve done. #tileremoval #floorgrinding #renovations

03.01.2022 The boys travelled out to GLAMORGAN Vale to pull up 97m2 of tiles from patio areas around a house and 55m2 of tiles and scion from a deck. It was insurance work for one of our regular clients. Now its ready to be fixed up and waterproofed properly. #tileremoval #floorgrinding #dustfreetileremoval

01.01.2022 It’s not often we get to do this, however yesterday we were back at Mermaid Beach to start the full stripout of a penthouse apartment. We had previously been there to remove all the exterior paths, pool area and balconies. These have since been redone so I can show you the before, during and after if a job. #tileremoval #renovations #tiling

Related searches